video corpo

UM 2.1/UM 2.2/UM 2.3
1 / 20Páginas

Excertos do catálogo

UM 2.1/UM 2.2/UM 2.3 - 1

Technical Documentation UM 2.1/UM 2.2/UM 2.3 Measurement evaluation units

Abrir o catálogo na página 1
UM 2.1/UM 2.2/UM 2.3 - 2

© Copyright: Reproduction and translation only with the written consent of the company FAFNIR. FAFNIR reserves the right to carry out product alterations without prior notice. Measurement evaluation units UM 2.1/UM 2.2/UM 2.3

Abrir o catálogo na página 2
UM 2.1/UM 2.2/UM 2.3 - 3

Measurement evaluation units UM 2.1/UM 2.2/UM 2.3

Abrir o catálogo na página 3
UM 2.1/UM 2.2/UM 2.3 - 4

Characteristic features of the measurement evaluation units UM 2.1, UM 2.2 and UM 2.3 The measurement evaluation units UM 2.1, UM 2.2 and UM 2.3 U / UM 2.3 I are used for evaluating and displaying levels of liquids in tanks. The levels measured and transferred to the measurement evaluation units are processed in such a way that they can either be read off a display on the measurement evaluation units or have an electrical output: • UM 2.1 indicates the level in the form of a bar display and outputs two freely definable limit values via changeover contacts. • UM 2.2 provides an output of...

Abrir o catálogo na página 4
UM 2.1/UM 2.2/UM 2.3 - 5

The measurement evaluation units UM 2.1, UM 2.2, UM 2.3 U, or UM2.3 l serve the purpose of measuring and evaluating the filling levels in tanks. Use the system for this purpose only. The manufacturer shall not be liable for any form of damage resulting from improper use! The measurement evaluation units were developed, manufactured and inspected in accordance with state-of-the-art technology and with recognised technical safety rules and regulations. Nevertheless, hazards may arise from the use of these devices. Therefore, observe the following safety instructions. Do not change or modify...

Abrir o catálogo na página 5
UM 2.1/UM 2.2/UM 2.3 - 6

Structure and mode of operation Measurement evaluation units UM 2.1, UM 2.2 and UM 2.3 U/ UM 2.3 I contain the power supply and signal evaluation for the connected level sensor. Measurement evaluation unit UM 2.1 Measurement evaluation unit UM 2.1 has a light-strip indicator with 5% increments for displaying the levels in the tank (1). With the Test button (4) and three potentiometers (5) at the bottom of the measurement evaluation unit two limit values can be set. The operating state of the measurement evaluation unit is indicated by three LEDs (LEDs). The green LED „Operation“ (3) is lit...

Abrir o catálogo na página 6
UM 2.1/UM 2.2/UM 2.3 - 7

Measurement evaluation unit UM 2.2 Measurement evaluation unit UM 2.2 provides an output of 0/4–20 mA and an output of 0–10 V proportional to filling level. The green LED „Operation“ (1) is lit when the UM 2.2 is connected to the power supply and is ready for operation. 1 Hersteller: FAFNIR GmbH Hamburg Hilfsenergie: 230 V Ausgang: 0(4)–20mA max. 500 Ω Fig. 1b: Measurement evaluation unit UM 2.2 Measurement evaluation units UM 2.1/UM 2.2

Abrir o catálogo na página 7
UM 2.1/UM 2.2/UM 2.3 - 8

Measurement evaluation units UM 2.3 U and UM 2.3 I Measurement evaluation units UM 2.3 and UM 2.3 I have a 4-digit numeric display for indication the levels in the tank (1). With the aid of the plus (2) and ok buttons (7) at the top of the measurement evaluation unit the unit can be configured and matched to respective tank data. With the Test button (5) and three potentiometers (6) at the bottom of the measurement evaluation unit two limit values can be set. The operating state of the measurement evaluation unit is indicated by three LEDs (LEDs). The green LED „Power“ (4) is lit when the...

Abrir o catálogo na página 8
UM 2.1/UM 2.2/UM 2.3 - 9

Installation The measurement evaluation units are integrated into a plastic housing with IP 40 protection and must be installed in a weatherproof location. The permissible ambient temperature is between -20 °C and +40 °C. Carry out the wiring work only when the unit is in its deenergised state. Switch off the 230 V power supply system before opening the measurement evaluation unit. The power supply system is only allowed to be switched on only when the measurement evaluation unit has been firmly screwed together. For any work being carried out on the measurement evaluation unit, the...

Abrir o catálogo na página 9
UM 2.1/UM 2.2/UM 2.3 - 10

2. Connect up measurement evaluation unit in accordance with Figs. 2a, 2b, 2c and 2d. N - Output 0–10V RLoad ≥ 10 kOhm Connecting cable Filling level sensor – UM 2.1 4 x 0,5 mm2, shielded Filling level sensor Fig. 2a: Connection of the measurement evaluation unit UM 2.1 L1 (-) not galvanically separated from 3 and 4 + Output 0 V bis 10 V - RLoad ≥ 10 kOhm not galvanically separated from 3 and 4 Connecting cable Filling level sensor – UM 2.2 4 x 0.5 mm2, shielded Filling level sensor Fig. 2b: Connection of the measurement evaluation unit UM 2.2 Measurement evaluation units UM 2.1/

Abrir o catálogo na página 10
UM 2.1/UM 2.2/UM 2.3 - 11

- Output 0–10V + R Load ≥ 10 kOhm Connecting cable Filling level sensor – UM 2.3 U 4 x 0.5 mm2, shielded Filling level sensor Fig. 2c: Connection of the measurement evaluation unit UM 2.3 U N Connecting cable Filling level sensor – UM 2.3 I 2 x 0.5 mm2 Filling level sensor Fig. 2d: Connection of the measurement evaluation unit UM 2.3 I Measurement evaluation units UM 2.1/UM 2

Abrir o catálogo na página 11
UM 2.1/UM 2.2/UM 2.3 - 12

3. Replace the housing and screw it on. 4. Finally turn on the power supply. The green LED „Operation“ and „Power“ are lit. Hersteller: FAFNIR GmbH Hamburg Hersteller: FAFNIR GmbH Hamburg Hilfsenergie: 230 V Ausgang: 0(4)–20mA max. 500 W Betrieb Test Power Test FAFNIR GmbH Hamburg Measurement evaluation unit UM 2.2 is now ready for operation. Measurement evaluation unit UM 2.3 still has to be configured and matched to the respective tank data. Finally, the two limit values are set on measurement evaluation units UM 2.1 and UM 2.3. Measurement evaluation unit UM 2.1 Setting limit values To...

Abrir o catálogo na página 12
UM 2.1/UM 2.2/UM 2.3 - 13

and switches off again when the filling height is exceeded with a value of 23 %. Messauswertung Typ UM 2.1 Hersteller: FAFNIR GmbH Hamburg Fig. 3: Measurement evaluation unit UM 2.1 Measurement evaluation units UM 2.3 U and UM 2.3 I Configuring measurement evaluation units When the measurement evaluation unit has been connected up to the level sensor and the power supply, it has to be configured for correct indication of the level of liquid and hence for the respective tank data. The following parameters are configured in this order: 1. Decimal point (on the display) 2. Decimal point (on...

Abrir o catálogo na página 13

Todos os catálogos e folhetos técnicos FAFNIR GmbH

  1. TORRIX M12 MOBILE

    2 Páginas

  2. TORRIX XTS

    2 Páginas

  3. TORRIX 6

    1 Páginas

  4. LPG Sensors

    8 Páginas

  5. SEPARIX

    8 Páginas

  6. Process Automation

    28 Páginas

  7. O²-PID

    4 Páginas

  8. COMS Leaflet

    4 Páginas

  9. QE 200

    4 Páginas

  10. UM 2.1/2.2/2.3

    20 Páginas

  11. TORRIX HART

    28 Páginas

  12. TORRIX M12

    40 Páginas

  13. FAFNIR Hart Setup

    9 Páginas

  14. LS 300 / 500

    7 Páginas

  15. 76 A / NB 220

    5 Páginas

  16. 76 / NB 220

    2 Páginas

  17. SECON-X

    4 Páginas

  18. PRESSURIX

    12 Páginas

  19. Insite360

    4 Páginas

  20. Plugs

    12 Páginas

  21. TORRIX-HART

    28 Páginas

  22. DIVELIX

    8 Páginas

  23. CONDURIX-HART

    28 Páginas

  24. CONDURIX

    24 Páginas

  25. VAPORIX

    12 Páginas

  26. VISY-X

    24 Páginas

  27. Accessories

    3 Páginas

  28. VISY-Command Web

    4 Páginas

  29. VISY-Reed

    4 Páginas

  30. VISY-RF

    2 Páginas

  31. VISY-Stick

    15 Páginas

  32. VISY-TD Display

    2 Páginas

  33. VISY-View Touch

    2 Páginas

  34. TORRIX

    10 Páginas

  35. TORRIX CI

    1 Páginas

  36. TORRIX RS485

    3 Páginas

  37. UM-X Transducer

    3 Páginas

  38. TEMPERIX

    8 Páginas

  39. VISY-Command

    5 Páginas

  40. LPG-Sensoren

    8 Páginas

Catálogos arquivados

  1. HPH Ex d

    3 Páginas

  2. VISY-Monitor

    2 Páginas

  3. VISY-X LON

    10 Páginas

  4. SEPARIX

    23 Páginas

  5. VISY-Setup V 3.1.0

    40 Páginas

  6. VISY-Setup V2.10

    42 Páginas

  7. VISY-View

    24 Páginas