SLAG VERTICAL ROLLER MILL THE GRMK
4Pages

{{requestButtons}}

Catalog excerpts

SLAG VERTICAL ROLLER MILL THE GRMK - 1

Process introduction The GRMK vertical cement mill of CHAENG adopts a new generation of cement grinding technology, which integrates grinding, drying and powder selecting functions. It can save 30% of power per ton compared with traditional ball mill. At the same time, it has many advantages, such as less auxiliary equipment, multiple functions, small occupied area and little dust pollution. It is widely used in clinker grinding production of cement plant and grinding plant. CHAENG can provide various types of vertical cement mills with productivity of 50­250t/h. The biggest advantage of CHAENG is to have a large casting base and large machining workshops, which greatly shortens the delivery cycle of cement vertical mill. GRMK vertical cement mill has the advantages of compact structure and small volume. It mainly includes high efficiency separator, grinding rollers, grinding table, hydraulic loading device of grinding roller, hydraulic lubrication system, reducer, motor, and electrical components. 1. Separator is an efficient and energy­saving powder selection device. 2. Grinding roller is used to grind and crush materials. 3. The grinding table is fixed on the output shaft of the reducer. It is the place where the grinding rollers grind materials. 4. The hydraulic loading device is a component that provides grinding pressure for the roller. And it provides sufficient pressure to crush the materials.

Open the catalog to page 1
SLAG VERTICAL ROLLER MILL THE GRMK - 2

Investment return CHAENG can provide a variety of schemes for cement grinding, and make a choice according to the actual situation and needs of customers: Scheme III Closed­circuit ball Vertical roller mill finish­ mill system grinding system grinding system

Open the catalog to page 2
SLAG VERTICAL ROLLER MILL THE GRMK - 3

surface) Medium As can be seen from the table, the vertical roller mill system is superior to the ball mill and roller press system in the aspect of power saving. In terms of power saving, the following includes an account for you: Economic benefit analysis: the economic benefit caused by the high running rate, power saving and operation maintenance cost of vertical mill system If one ton of cement saves 4.5kwh/t power, one day produces 5000T cement, one year works 300 days, and electricity cost is 0.7 yuan per kilowatt hour, you can save electricity cost: ¥4,725,000 per year...

Open the catalog to page 3
SLAG VERTICAL ROLLER MILL THE GRMK - 4

Project One cement factory in China purchased GRMK53.41 cement vertical mill from CHAENG in 2012. This vertical mill is the first and the largest cement vertical mill in China, adopting new efficient powder separator, easy to operate and operating stably. Its designed output is 220t/h, and the actual output is up to 260t/h. Cement produced by this vertical mill possess good quality not lower than that of ball mill, the leader of Meng Electric Group expressed his great satisfaction. About CHAENG...

Open the catalog to page 4

All Xinxiang Great Wall Machinery Co. catalogs and technical brochures

  1. Ball mill

    5 Pages

  2. features

    5 Pages

  3. Slag pot

    5 Pages

  4. Kiln tyre

    4 Pages

  5. GRATE COOLER

    3 Pages

  6. COAL MILL

    4 Pages

  7. ROD MILL

    3 Pages

  8. ROATRY DRYER

    3 Pages

  9. GIRTH GEAR

    5 Pages

  10. PREHEATER

    3 Pages

  11. JAW CRUSHER

    2 Pages

Archived catalogs

  1. GRM Series

    2 Pages