1. Catalogs
  2. Weasler
  3. UNIVERSAL JOINT

UNIVERSAL JOINT

UNIVERSAL JOINT

Product catalog summary
Disassembly of Universal Joint:
  • Remove all snap rings to begin the disassembly process.
  • Position the joint in a loose vise and strike the top arm of the unsupported yoke to drive the top cup up. Repeat on the opposite side.
  • If the loosened cup cannot be gripped, use a pointed tool to tip a needle bearing and repeat the previous step.
  • Grip the loosened cup in a vise and strike the yoke arm to drive the yoke off the cup. Repeat for the opposite cup.
  • Support the cross in a loose vise and strike the yoke arm to remove the remaining two cups.
Reassembly of Universal Joint:
  • Smear grease into bearings and check for dirt before starting the reassembly.
  • Insert the cup and cross, driving them in with a spacer.
  • Insert the snap ring to secure the assembly.
  • Insert the second cup and hold the cross into the cup, driving the cup flush with the arm.
  • Drive the cup down with a spacer and insert the snap ring.
  • To ensure the cross is loosened, strike the yoke arm and check for free rotation.
  • Position the second yoke on the cross and repeat the previous steps.
  • Grease the kit after the assembly is completed.
Important Notes:
  • Ensure all needle bearings are seated properly to avoid damage.
Contact Information:
  • Weasler Engineering, Inc., USA: +1-262.338.2161
  • Weasler Engineering BV, Netherlands: +31 (0)24 64 89 100
  • Weasler Engineering Kft, Hungary: +36 (0)76 500 410
  • Email: [email protected]
  • Website: www.weasler.com
See more

Catalog excerpts

UNIVERSAL JOINT-1

UNIVERSAL JOINT SERVICE INSTRUCTIONS SNAP RING 1 Remove all snap rings TO DISASSEMBLE UNIVERSAL JOINT EXTERNAL Position joint in loose vice, strike top arm of unsupported yoke to drive the top cup up. Repeat on opposite side. If you cannot grip the loosened cup per Step 3, use a pointed tool to tip a needle bearing then repeat Step 2. Grip loosened cup in vise, strike yoke arm to drive yoke off cup. Repeat on opposite cup. Support cross in loose vise and strike yoke arm. Repeat Step 3 to remove remaining two cups. TO REASSEMBLE UNIVERSAL JOINT N: Smear grease into bearings and check for dirt. Insert cup and cross. Drive in with spacer. Insert snap ring. Insert second cup and hold cross into cup. Drive cup flush with arm. GREASE KIT AFTER ASSEMBLY IS COMPLETED Drive cup down with spacer and insert snap ring. To loosen cross, strike yoke arm and check cross for free rotation. Position second yoke on cross. Repeat Steps 2 to 6. UNCONTROLLED DOCUMENT 56-15134-02 Weasler Engineering, Inc. P.O. Box 558, West Bend, WI 53095 USA Tel: +1-262.338.2161, Fax: +1-262.338.3709 E-mail: [email protected] web site: www.weasler.com Weasler Engineering BV P.O. Box 266, 6600 AG, Wijchen, The Netherlands Tel: +31 (0)24 64 89 100, Fax: +31 (0)24 64 89 109 E-mail: [email protected] web site: www.weasler.com Weasler Engineering Kft P.O. Box 262, H6001, Kecskemet, Hungary Tel: +36 (0)76 500 410, Fax: +36 (0)76 500 415 E-mail: [email protected] web site: www.weasler.co

 Open the catalog to page 1
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.