AXIS Guided Boring Systems Overview
12Pages

{{requestButtons}}

Catalog excerpts

AXIS Guided Boring Systems Overview - 1

An innovative solution for water and sewer installation Guided Boring System Equipment shown is for illustrative purposes only and may display optional accessories or components. Please contact your Vermeer dealer for more information about machine specifications. Vermeer Corporation reserves the right to make changes in engineering, design and specifications; add improvements; or discontinue manufacture at any time without notice or obligation. Vermeer, the Vermeer logo, AXIS, Navigator and Commander are trademarks of Vermeer Manufacturing Company in the United States and / or other countries. McLaughlin and the McLaughlin logo are trademarks of McLaughlin Group, Inc. Vac-Tron is a trademark of Vac-Tron Equipment. © 2012 Vermeer Corporation. All Rights Reserved. 10/12

Open the catalog to page 1
AXIS Guided Boring Systems Overview - 2

Our deteriorating infrastructure Globally the need to replace and expand sewer and clean water systems presents a vast challenge and opportunity. Much of the sewer and water pipelines installed over the past 100 years have reached the end of their useful life. This existing network of pipelines has been stressed by population growth and urban sprawl in developed countries, while many developing nations completely lack a sanitary sewer and clean water infrastructure. These challenges are real and becoming more pronounced each passing year. According to an article in the September / October...

Open the catalog to page 2
AXIS Guided Boring Systems Overview - 3

installation options A growing number of water and sewer projects are required to be placed precisely on-grade. This work is often viewed to be tedious, labor-intensive and expensive using traditional installation methods. Some of the current trenchless methods are designed to achieve the extreme accuracy necessary for this kind of work; however, they lack the productivity needed to compete with the open-cut method. Now underground contractors have a new tool in the effort to replace and expand the crumbling sewer and water infrastructure. The Vermeer AXIS® guided boring system is a...

Open the catalog to page 3
AXIS Guided Boring Systems Overview - 4

Guided Boring System The AXIS guided boring system is designed to install 10- to 14-inch (25.4 to 35.6 cm) pipe at lengths up to 350 feet (106.7 m), ideal for manhole-to-manhole installations. The system is capable of maintaining the strict tolerance and accuracy required for sewer and water projects.

Open the catalog to page 4
AXIS Guided Boring Systems Overview - 5

How the system works: the basics To understand the unique features of the AXIS guided boring system, take a step-by-step look at how the system works. First, two pits are dug; one at each end of the bore. The first will serve as the launch pit; the other will be the exit pit. Then the pipe laser is set in the launch pit at the grade and depth the project requires. Next, the leveling frame and rack assembly are lowered into the launch pit. The drill head is lowered next, and contained within the drill head is a camera connected to a monitor on the operator console. With the camera viewing...

Open the catalog to page 5
AXIS Guided Boring Systems Overview - 6

Located outside of the launch pit, the AXIS system consists of the vacuum power unit, vacuum tank and the rack power unit. VACUUM POWER UNIT A high-performance liquid ring vacuum power unit provides 3400 cfm (96.3 m3/ min) at 26 in. Hg (660.4 torr) (wet) to remove excavated material from the bore. VACUUM TANK Upon reaching the launch pit, the excavated material transitions from the drill casing to a 6-inch (15.2 cm) diameter hose running up the launch pit to a 2000 gal (7570.8 L) or 800 gal (3028.3 L) vacuum tank. RACK POWER UNIT A self-contained rack power unit features a 140-hp (104.4 kW)...

Open the catalog to page 6
AXIS Guided Boring Systems Overview - 7

AXIS guided boring system Located in the launch pit is the core of the AXIS system, which is made up of the rack, drill casings, drill head and pipe laser. RACK The rack includes the thrust / pullback carriage assembly and gearbox. As the thrust / pullback carriage assembly moves up the rack, the gearbox simultaneously provides rotation to the cutter bit at the front of the drill head. DRILL CASINGS Drill casing segments, measuring 6.5 feet (2 m) long, are placed in the rack carriage. Each segment features a laser sight channel and a vacuum channel for removing excavated material from the...

Open the catalog to page 7
AXIS Guided Boring Systems Overview - 8

A solution for your sewer and water installation needs The AXIS guided boring system offers numerous advantages to other installation methods that help enhance accuracy, efficiency and safety. Precise On-grade Drilling — A closed-circuit camera integrated into the drill head allows the operator to constantly monitor the process on a screen integrated into the controls console. The operator can make corrective steering adjustments to the drill head if needed to maintain line and grade. This combination of user-friendly technology allows the AXIS system to achieve the precision tolerances...

Open the catalog to page 8
AXIS Guided Boring Systems Overview - 9

Restoration costs — The AXIS guided boring system is designed to help minimize restoration costs compared to other methods. It requires surface excavation for two pits that can serve as the manhole locations, saving additional excavation time and resources. When compared with open cut, the AXIS system significantly decreases surface restoration costs. EXCAVATED material REMOVAL — The vacuum excavation method helps to maintain a clean and compact site. Gone are the piles of spoil and the multiple trucks and loaders often required with other methods. Once the spoil is contained in the vacuum...

Open the catalog to page 9
AXIS Guided Boring Systems Overview - 10

Sewer and water installation solutions Vermeer understands the sewer and water business and works to offer not only products, but solutions and expertise to help you succeed. For more than 60 years Vermeer has worked with customers to help find the right solutions for their company and projects. Our products and services are backed by thousands of employees dedicated to designing, building, and supporting your equipment. VERMEER SEWER AND WATER PRODUCTS Horizontal directional drilling Vermeer Navigator® horizontal directional drills (HDD) help make sewer and water installations productive...

Open the catalog to page 10
AXIS Guided Boring Systems Overview - 11

Our deteriorating infrastructure Globally the need to replace and expand sewer and clean water systems presents a vast challenge and opportunity. Much of the sewer and water pipelines installed over the past 100 years have reached the end of their useful life. This existing network of pipelines has been stressed by population growth and urban sprawl in developed countries, while many developing nations completely lack a sanitary sewer and clean water infrastructure. These challenges are real and becoming more pronounced each passing year. According to an article in the September / October...

Open the catalog to page 11

All Vermeer Manufacturing catalogs and technical brochures

  1. BC900XL

    2 Pages

  2. AX19

    2 Pages

  3. S925TX

    2 Pages

  4. CTX100

    2 Pages

  5. D60x90 S3

    2 Pages

  6. D24x40 S3

    2 Pages

  7. D40x55 S3

    2 Pages

  8. D23x30 S3

    2 Pages

  9. WC2300XL

    2 Pages

  10. TG7000

    8 Pages

  11. TG5000

    6 Pages

Archived catalogs

  1. Quick Clip

    2 Pages