Product catalog
14Pages

{{requestButtons}}

Catalog excerpts

Product catalog - 1

URA LK RAW PRODUCT catalog GC "URALKRAN"

Open the catalog to page 1
Product catalog - 2

Electric hoists wire rope Electric wire rope hoists «VERTA» are an innovative development of “Uralkran”, which incorporates both classic and contemporary solutions. Through optimization of structure (location of three-step or four-step planetary reduction gear inside the cylinder) electric hoists “VERTA” became more compact, quiet, with low level of vibration of electric motor, and they may be used as a weight lifting mechanism of a crane or as an independent hoisting equipment. Review of one standard application – less than 15 min. Conclusion of standard invoiceagreement – less than 1...

Open the catalog to page 2
Product catalog - 3

ELECTRIC HOISTSwire rope CO Z o »— v UJ 0,55 i000 Variant with single or double travelling and lifting speed, with soft start option; 0'55 1500 1'57 Seismic resistance: normal seismic res. up to 6 on MSK-64 scale Lifting speed* — micro-lifting speed. Hoist is not designed for continuous operation with a micro-lifting speed. Current parameters of electric motors are given for electric power network 380V, 50Hz. GROUP OF COMPANiES "URALKRAN" 134, Artilleriiskaya St., chelyabinsk, 454007, Russia Phone/fax: +7(351) 211-31-05/06/07 E-mail: mail@uralkran.ru www.uralkran.ru 24 HOUR TECHNICAL...

Open the catalog to page 3
Product catalog - 4

general purpose Box-shaped section of beam in the crane structure significantly increases its operation life. Maximum precision assembling allows to develop and produce gantry cranes of: • any dimensions and configurations (incl. cranes with carrying capacity over 500 tons). • Jib cranes and cranes without jib. With rotational and non-rotational trolley. With decreased installation readiness. Gantry double-girder crane, carrying capacity 20 tons (Crane plant “Verta”, Chelyabinsk, 2013) Review of a standard application -less than 1 hour. Gantry single-girder general purpose industrial...

Open the catalog to page 4
Product catalog - 5

Special cranes container Mastered series of decisions allows to significantly increase performance and where necessary solvenon-standard problems related to movement of loads. In-house production of spreaders: • To fully equip the container crane with necessary suspended devices. Structure of container cranes was optimized to achieveperformance efficiency of 1 failure/220 days (subject to scheduled maintenance). Special container crane, carrying capacity 36 tons (“Transkonteiner” OJSC, Kazan, 2014) Review of a standard application – less than 1 hour. Total period of production – to up 170...

Open the catalog to page 5
Product catalog - 6

OVERHEAD cranes double-girder general purpose Cranes with carrying capacity from 5 to 50 tons – serial production of “URALKRAN”. Cranes are equipped with in-house produced hoists. It allowed to: • Increase the operational life of a crane. • Optimize the period of crane manufacturing. • Set an attractive price. Overhead double-girder crane, carrying capacity 10 tons (LLC Uralskiye Lokomotivy, Pyshma, 2013) Review of a standard application – less than 1 hour. Total period of production – less than 45 calendar days. Delivery and installation – less than 5 business days. Product warranty – up...

Open the catalog to page 6
Product catalog - 7

OVERHEAD CRANESdouble-girder industrial 500 tons and more Employment of frequency-type controlling system for all movement vectors of a crane: Ensures smooth speed adjustment. Allows precise positioning of load. Decreases energy consumption by more than 30%. Increases life span of mechanisms. Improves performance. Overhead double-girder crane, carrying capacity 370 tons («South Ural GRES», Yuzhnouralsk, 2014) Review of a standard application ■ less than 1 hour. Total period of production -to up 90 calendar days. Delivery and installation -less than 10 business days. Product warranty -up to...

Open the catalog to page 7
Product catalog - 8

Overhead double-girder special casting crane, carrying capacity 20/10 tons (“CHEMK” OJSC, Chelyabinsk, 2012) m ^ cranes & components OURALKRAIU OVERHEAD CRANES special casting safety and monitoring systems implemented in the cranes allow to: • Control crane operation online. • Watch the loads and immediately interfere in the process of operation in case of accidents. • In a required format visualize all stages of crane operation (including cases of violations, committed during crane operation) with remote output of main characteristics to a control panel or a monitor. Review of a standard...

Open the catalog to page 8
Product catalog - 9

m ^ cranes & components OURALKRAIU OVERHEAD CRANES special bucket Overhead double-girder special bucket crane. carrying capacity 25 tons ("RusalAchinskiy Alumina Refinery plant" oJsC, Achinsk. 2012) Structure of bucket crane manufactured by "URALKRAN" is marked by increased installation readiness, which allows to: • Install the crane within the customer's territory, in conditions of active 24-hour production, within 120 hours (including commissioning works) without welding. For clients of "uRALKRAN" there are special programs related to efficient arrangement of in-house transport logistics....

Open the catalog to page 9
Product catalog - 10

Review of a standard application less than 1 hour. Total period of production -45 calendar days. Delivery and installation -less than 2 business days. Product warranty -up to 36 months. Overhead single-girdersupported crane, carrying capacity 10 tons (separate subdivision "SKZ" LLC, Korkino, 2013) Optimized upper sizeof the crane by means of innovative engineering solutions allows to: • Place the hoisting equipment in close proximity to building roof; • Solve the problem related to increasing of lifting height without increasing of crane dimensions; • Minimize expenses on acquisition of...

Open the catalog to page 10
Product catalog - 11

single-girder underhung ypA/lKPAH Overhead single-girder underhung crane, capacity 3.2 tons (“ISS n.a. M.F. Reshetnev” OJSC, Zheleznogorsk, 2015) special solutions, taking into account employment of optimal crane structure, allow to synchronize crane movement and optimize the process of lifting-moving of a load in a technological cycle: • High-precision positioning of load according to set coordinates. Remote management of the crane (which includes management from the office). Operation of two cranes in a tandem. Review of a standard application -less than 1 hour. Total period of production...

Open the catalog to page 11