Overview
The Single Phase Load Shedding Relay is designed to manage power consumption by disconnecting non-priority circuits during peak usage to prevent tripping the main circuit breaker. It measures the total current using a toroidal transformer and displays it. An internal buzzer alerts users when consumption exceeds the set maximum current.

Operation
When the current exceeds 10% of the maximum set current, the relay disconnects non-priority loads to maintain consumption at an acceptable level. These loads are reconnected after a pre-adjusted restart time.

Technical Specifications
  • Supply Voltage: 230 Vac 50 Hz
  • Relay Consumption: Max. 2VA
  • Rated Current Adjustment (6 steps):
    • 5A (1150W)
    • 10A (2300W)
    • 15A (3450W)
    • 20A (4600W)
    • 25A (5750W)
    • 30A (6900W)
  • Internal Contact for Non-Priority Load: 5A, 250V (1250W)
  • Measurement Precision: 0.1A (from 1 to 30A)
  • Re-connect Time: 1 to 30 minutes
  • Weight: 200 g
  • Acoustic Warning: Adjustable tone rate

Installation Diagram
The installation diagram includes connections for non-priority and priority circuits, with an optional contactor. The non-priority circuit is limited to a maximum of 5A.
See more

Catalog excerpts

Single phase Load Shedding Relay-1

Single phase Load Shedding Relay

 Open the catalog to page 1
Single phase Load Shedding Relay-2

Single phase Load Shedding Relay. The load shedding relay limits the power consumption before tripping the main circuit-breaker . T do this, non-priority circuits will be disconnected during peaks of power consumption. o The total current of the installation is measured by a small toroidal transformer and shown on the display. When it reaches the maximum current set, an internal buzzer alerts of over-consumption. If measured current exceeds 10% of maximum current, the non-priority load is disconnected to keep consumption at admissible level. The non-priority load is re-connected after a re-start...

 Open the catalog to page 2
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.