The guide provides instructions for setting up Optical Tops and Breadboards, emphasizing the importance of safety and the use of professional riggers due to the heavy nature of the equipment. It outlines the necessary steps to unload, unpack, and move the optical tops to their setup location.

Unpacking Instructions
1. Use a forklift to remove the optical top from the delivery truck.
2. Uncrate the optical top by removing the top, sides, and ends of the crate.
3. Lift the skid with a forklift centered on the long side, allowing it to bow.
4. Insert shim blocks at the ends of the skid as it is lifted.
5. Lower the skid back to the ground, ensuring the optical top sits on the shims.
6. Move the optical top to its destination using a forklift or professional rigging techniques.

Setup Instructions
- The optical top can be placed on its side, but the load must be supported by the top and bottom skins.
- Follow specific instructions for setting up the optical top with System 1 Post-Mount Supports.
- For installations using STACIS 2100 isolators, refer to the STACIS Pre-installation Manual and Checklist, and ensure a TMC trained technician completes the installation.
See more

Catalog excerpts

Optical TopsDQG Breadboards-1

Vibration Isolation Systems Setup Guide, 2015 Optical Tops, Breadboards, and Supports Optical Tops Breadboards TMC Ametek, Peabody, Massachusetts

 Open the catalog to page 1
Optical TopsDQG Breadboards-2

Vibration Isolation Systems Setup Guide, 2015 Optical Tops, Breadboards, and Supports Optical Tops & Breadboards Introduction Caution Optical Tops and Breadboards are heavy. TMC recommends the hiring of professional riggers or machinery movers to uncrate move to internal destination and to assist in the following procedure. The following procedure provides suggested steps to unload an Optical Top from a delivery truck, unpack and move to area for setup. Three people are typically required for the heavier tabletops. Safety is very important! Ensure you have the proper equipment and understand...

 Open the catalog to page 2
Optical TopsDQG Breadboards-3

Vibration Isolation Systems Setup Guide, 2015 Optical Tops and Breadboards Unpacking Instructions Remove optical top from receiving area or delivery truck. Removing optical top will typically require a forklift. Remove top, sides and ends of optical top crate exposing the top on skid. Lift skid with a fork lift centered on long side. The skid will bow as crate is lifted. Fork lift tines Figure 2, Lifting crate centered on long side As skid is lifted and bows, insert appropriate size shim blocks on ends of skid as shown in figure below. Optical top Shim block Skid bowing Figure 3, Inserting shim...

 Open the catalog to page 3
Optical TopsDQG Breadboards-4

Vibration Isolation Systems Setup Guide, 2015 Optical Tops and Breadboards Lift optical top from skid using space between top and skid and move to destination using fork lift if possible. Otherwise use professional rigging techniques. Optical top Shim block Skid Figure 5, Remove optical top from skid An optical top may be placed on its side. However, its load must be supported by the top and bottom skins, not by the side-walls. Note Set up optical top per appropriate instructions Proceed to install and setup optical top along with System 1 Post-Mount Supports as appropriate for your system configuration....

 Open the catalog to page 4
Optical TopsDQG Breadboards-5