
TableTop Platforms Vibration Isolation Systems Setup Guide, 2017 Figure 1, 66 Series TableTop CSP Introduction The 66 Series TableTops require a continuous supply of compressed air or Nitrogen to operate properly. For a complete discussion of the air supply requirements, see System Air Supply Requirements in introduction section of this document. Setup Instructions Tools Required: Utility knife, 6 inch scale Step 1 Carefully remove isolator from the inner carton and plastic bag. Save the carton for future transport. The inner carton contains four carefully positioned rigid foam pads and brackets which lock out the isolator when the carton is closed. Note Place the isolator on a firm level surface. Connect the air supply to the rear air inlet. TMC Ametek, Peabody, Massachusetts
Open the catalog to page 1Vibration Isolation Systems Setup Guide, 2017 TableTop Platforms Set air supply pressure to 20 psi. Wait approximately 2 minutes for the top plate to float. Place the instrument to be isolated on the top surface. Wait about 1 minute for top plate to settle. Level the plate at a height of 3/8 inch by turning each of three thumb wheels located on three sides as shown in figure below to adjust internal height adjusting valves. The plate travel range is from 3/16 inch to 9/16 inch. Height = 3/8” Thumb Wheel Figure 2, Height adjustments Increase Height: Move wheel to the right in a counter clockwise...
Open the catalog to page 2Vibration Isolation Systems Setup Guide, 2017
Open the catalog to page 38 Pages
18 Pages
44 Pages
11 Pages
44 Pages
22 Pages
11 Pages
3 Pages
4 Pages
2 Pages
4 Pages
5 Pages
27 Pages