TERRA-HYDROCRACK HC 600 C+ replaces 280 m (925 ft) cast iron pipe OD 250 mm (10") in only 3 days
2Pages
Catalog excerpts
TERRA-HYDROCRACK HC 600 C+ TERRA-HYDROCRACK HC 600 C+ replaces 280 m (925 ft) cast iron pipe OD 250 mm (10") in only 3 days City: Contractor: Length: New pipe: Old pipe: Machine: Underground: Thun, Switzerland Zehnder RT GmbH, Birmenstorf, Switzerland 280 m (925 ft) in 5 sections HDPE pipe OD 250 mm (10") cast iron pipe GG Ø 250 mm (10"), partly even ductile cast iron TERRA-HYDROCRACK HC 600 C+ (Comfort Version) mixed clay, sand and gravel The TERRA-HYDROCRACK HC 600 C+ is positioned in the working pit. The rods are in the magazine underneath the operator seat. The new HDPE pipe OD 250 mm (10") is pulled in with the expander cone ∅ 325 mm (12.8"). Gut zu sehen die gefüllte Gestängebox I:\MS\Baustelle\englisch\HC 600 C+\bau-102e.doc The 3-wing cutter and the new HDPE pipe OD 250 mm (10") reach the intermedium pit. 1/2 MSch-07.10.2010
Open the catalog to page 1TERRA-HYDROCRACK HC 600 C+ 1 2 3 1 2 3 4 4 This is the old cast iron joint OD 350 mm (13.8"), which must be burst. The 3-wing cutter bursts the joint without problems. The expander cone Ø 325 mm (12.8") displaces the cast iron fragments sidewise so that no damage is done to the new HDPE pipe OD 250 mm. After 70 m (230 ft) the expander cone Ø 325 mm (12.8") and the new HDPE pipe OD 250 mm (10") arrive in the working pit. The main cylinder is moved backwards easily inside of the TERRAHYDROCRACK HC 600 C+ to pull in the bursting tools and the new HDPE pipe into the working pit (patented)....
Open the catalog to page 2All TERRA catalogs and technical brochures
-
TERRA Brochure
4 Pages