Project OverviewSouthern Peru Copper Corporation has commissioned a turn-key project for a
conveyor bridge at the Toquepala plant in Peru. The project involves the construction of a driveable conveyor bridge with specific technical specifications.
Technical Specifications- Construction Type: Driveable by crawlers
- Lift Height: 12 meters
- Service Measure: 491 tons
- Conveying Capacity: 8,350 tons per hour
- Height: 15.6 meters
- Total Length: 150 meters
- Outreach/Boom Length: 33.5 meters
- Span Width: 115 meters
- Belt Width: 1,828 mm
- Belt Speed: 4.4 meters per second
- Special Feature: Variable bridge length of either 65 meters or 150 meters
Project ScheduleThe commissioning of the project was scheduled for 2005.
Contact InformationFor further inquiries, contact Tenova TAKRAF at:
TAKRAF GmbH
Torgauer Straße 336
04347 Leipzig, Germany
Phone: +49 341 2423 500
Fax: +49 341 2423 510
Email:
[email protected]