RING LOCK & SYSTEM FORMWORK
44Pages

{{requestButtons}}

Catalog excerpts

RING LOCK & SYSTEM FORMWORK - 1

Project Design RING LOCK & SYSTEM FORMWORK

Open the catalog to page 1
RING LOCK & SYSTEM FORMWORK - 3

SUCOOT CO., LTD. was set up in 1984 and specializes in Scaffolding Accessories & Formwork Parts. Today, we have customers spreading over 65 countries around the world. Our products are engineered for the specific purpose ofsafety, strength and flexibility to meet international standards within this industry. We are confident that our quality is on parwith otherworld-leading brands—especially ourRing System Scaffold. This system is widely used in many civil engineering projects worldwide. This includes high speed rail, freeway, elevated railway, subway, high-tech factories, music concert...

Open the catalog to page 3
RING LOCK & SYSTEM FORMWORK - 4

Vertical Connection Allowanced 1.8mm To control the allowance between Verticals and Spigots within 1.8mm, we have developed a device that can remove the hot dip galvanizing residue inside the tube. * According to the test result, the loading can reach at least 94% when the maximum allowance is 1.8mm; whilst, if the other brand allowance is 3.0mm, the loading only can reach 50%. The higher the scaffold assembled, the less the loading can bear. Vertical Connection is Through "Cross Section", RatherThan "Point" We use high-precision circular sawing machines to ensure the tubes are cut...

Open the catalog to page 4
RING LOCK & SYSTEM FORMWORK - 5

Viaduct, Ramp, Side Traffic Lane, PierCap • Box Culvert, Drainage Culvert, Tunnel • Hi-Tech Factory, PowerPiant, WaterTower, Recycling Plant, Refinery, Incinerator • Large-Scale Performance Stage • Suspended Scaffolding for maintenance work in Shopping Mall / Department Store

Open the catalog to page 5
RING LOCK & SYSTEM FORMWORK - 6

¥ SUCOOT-• Ring System Scaffold can be flexibly assembled fordifferent kinds of projects. <Our engineer team can provide design and calculation as per your project>

Open the catalog to page 6
RING LOCK & SYSTEM FORMWORK - 7

Forsteep slopes, ourRing System can replace heavy duty frames in shoring.

Open the catalog to page 7
RING LOCK & SYSTEM FORMWORK - 8

Suspended Scaffolding- Tower and Bridge Taiwan Railway- Wujih New Station New Bangkok International Airport Access Scaffolding for High Level Installation Work Towers and Bridges can be moved with rollers which saves time and labor costs.

Open the catalog to page 8
RING LOCK & SYSTEM FORMWORK - 9

Industrial Park- 3000 tons Water Tower Industrial Park- 500 tons Water Tower Pumping Station Water Tower

Open the catalog to page 9
RING LOCK & SYSTEM FORMWORK - 10

Su ua g ay y o açade Suhua Highway Pylon Façade Taichung Expressway No.2 Shoring g Vietnam Power Plant Foundation Shoring T Taipei MRT- Y- Shaped Pier Cap Shoring Taipei MRT- Superstructure Formwork and Shoring

Open the catalog to page 10
RING LOCK & SYSTEM FORMWORK - 11

China Chongqing Bridge Three-span Shoring(6-30m height) p p g Y-Shaped Pier Cap Shoring g Underground, Cut-and-cover Tunnel Slab Sh Shoring Tunnel Shoring Shoring Platform for Roof Forming Machine

Open the catalog to page 11
RING LOCK & SYSTEM FORMWORK - 12

Israel Logistic Center-Tableform Application Chongqing, China H:37m Bridge Shoring Indonesia Bridge Pylon Shoring Taiwan Tunnel Arch Form Shoring Cable-stayed Pylon - Pier Table Shoring Shoring for Steel Structure Factory Assembly

Open the catalog to page 12
RING LOCK & SYSTEM FORMWORK - 14

• 048.6 mm System (Both metric and inch sizes are available.)

Open the catalog to page 14
RING LOCK & SYSTEM FORMWORK - 15

4. Features • All components have excellent structural strength. Verticals assembled with horizontals and diagonals can form excellent combination. • Simple and rapid assembly can save a lot oftime and laborcosts. • With the universaljoint and interchangeable components, this system can be used in different kinds of projects. All components are made ofhigh tensile steel ( JIS STK500 ) with hot dip galvanized finish forlong life.

Open the catalog to page 15
RING LOCK & SYSTEM FORMWORK - 16

¥ SUCOOT In viaduct construction, complete scaffold towers can be moved horizontally by using

Open the catalog to page 16
RING LOCK & SYSTEM FORMWORK - 17

-sVc SUCOOT • Ring System Scaffold can be used in different terrains and buildings. • It is compatible with various formwork types (traditional formwork, formwork system orsteelpanels) fora consummate design. • Using Sub-Verticals can easilysolve the problem ofheight alterations.

Open the catalog to page 17
RING LOCK & SYSTEM FORMWORK - 18

5. Connecting Techniques ● carrying capacity. Horizontal (Insert into small hole) Wedge Lock Ring (forged) Level Diagonal (Insert into big hole) Diagonal (Insert into big hole) nsert into big hole) t t The cross sections of our tubes are perfectly smooth. Vertical connection allowance is within 1.8mm

Open the catalog to page 18
RING LOCK & SYSTEM FORMWORK - 19

Level Diagonal U-Head Jack Basic Socket Jack Base Level Diagonal

Open the catalog to page 19
RING LOCK & SYSTEM FORMWORK - 20

Jack Base J48601 U-Head Jack U48601 # To adjust the scaffold height # Material : Threaded Tube STK400 Handle Nut FCD450 Base Plate SS400 • Threaded Tube : 048.2mmx600mmxt:5.0mm • Base Plate : 140mmxl40mmxt:6.0mm • U-Head : 170mmx150mmxH:50mm xt:6.0mm • Length : 200mm divided by Ring from the middle • Pipe : 060.2mm x t:3.2mm Basic Socket V62020 • Assembled with Jack Base and connected with Horizontal to steady the foundation • Material : STK500 Vertical V61100, V61150, V61200, V61300 • Main support of the entire system connected by Spigot • Material : STK500 Vertical without Spigot V60100,...

Open the catalog to page 20
RING LOCK & SYSTEM FORMWORK - 21

Horizontal H66060, H66090, H66150, H66180, H66240 ● To distribute force evenly between Verticals ● Connecting: ● Material : STK500 Diagonal D60610, D60910, D61510 D61810, D60615, D60915 D61515, D61815, D62415 ● To enhance the loadcarrying capacity and keep the entire system from deformation ● Material : STK500 Level Diagonal L61515, L61815, L61818, L62415 ● To restrict the scaffold in a foursquare (90° at each 1.5m×1.5m;1.8m×1.5m; angle), excellent steadiness 1.8m×1.8m;2.4m×1.5m; for high shoring ● Material : STK500 Ø48.6mm×t:2.3mm Heavy-Duty Beam Bracket ● Put on the Ring of Vertical, used...

Open the catalog to page 21
RING LOCK & SYSTEM FORMWORK - 22

The connection of Horizontals. gradienter Make sure they are horizontal to the ground The second layer of Horizontals. without Spigots same direction.

Open the catalog to page 22
RING LOCK & SYSTEM FORMWORK - 23

The second layer of Verticals with Spigots. The second layerof Diagonals. 7 The third layer of Horizontals. NB-Level Diagonal required only in specific situations (i.e. high loading, crane lifted towers - to be advised by our engineers.)

Open the catalog to page 23
RING LOCK & SYSTEM FORMWORK - 24

The Ring System Access Towercomplies with EN 12810-1, providing a safe and convenient access staircase at construction sites. Stair units completed with stair treads and top/bottom platforms (conversion platforms) are designed to fit with 1.5m vertical spacing on the Ring System. The staircase is securely locked with Sucoot’s special hook and wedge couplers. Internal handrails are attached to the staircase and Ring System Diagonals are used as external handrails. Each staircase weighs only 50kgs for easy erection. Just set the hook fixed on Horizontal and hammer the wedge tightly for a...

Open the catalog to page 24

All SUCOOT CO. catalogs and technical brochures