BIN-SA-06

BIN-SA-06

BIN-SA-06

Product catalog summary
Overview: The document describes the BIN-SA-06 and BIN-CA-06 overhead sliding rail systems designed for use in workshops and automotive sectors. These systems aim to eliminate cable and tube clutter in workstations by providing a streamlined solution for moving multifunctional hexagons.
Specifications:
  • Total Length: 6 meters, composed of 3 modules each 2 meters long.
  • Total Weight: 180 Kg, with each module weighing 60 Kg (noting a discrepancy where one module is also listed as 62 Kg).
System Features:
  • The BIN-CA-06 system includes a chain that distributes suction, air, and power along the rail's entire length, with a central power supply allowing 3 meters of sliding on each side.
  • The BIN-SA-06 version is available without suction but includes lighting adjacent to the rail.
Installation Options:
  • The overhead sliding rail can be both wall-mounted and ceiling-mounted, allowing the control unit to be positioned next to the workstation without obstructing the operator.
Applications:
  • Suitable for carpentry workshops and automotive body shops due to its practicality and versatility.
See more

Catalog excerpts

BIN-SA-06-1

POWDERS EXHAUST SYSTEMS TOTAL WEIGHT

 Open the catalog to page 1
BIN-SA-06-2

BIN-SA-06 OVERHEAD SLIDING RAIL WITH LIGHTS. USED TO MOVE THE MULTIFUNCTIONAL HEXAGONS. TOTAL LENGTH 6mt. WEIGHT 1 MODULE 62 Kg BIIN-SA-06 system is the solution of your needs to have a strong binary. Ideal to connect to multifunctional hexagons. LENGTH 1 MODULE 2mt. (TOT. 3 MODULES)

 Open the catalog to page 2
BIN-SA-06-3

The overhead sliding rail system is the solution that permanently delete the cable and tube encumbrance in the workstation. The BIN-CA-06 is mabe dy 3 pre-assembled modules of 2mt. each, for a total of 6mt. The chain - which distributes suction, air and power - slides inside along the entire length of the rail. The power supply of such energies take place in the central part, so there will be a 3mt. sliding each side. Thanks to its praticality and its versatility, the BIN-CA-06 is indicated for both carpentries workshops (1) and automotive sector, the body shops (2). Is also available the version...

 Open the catalog to page 3

All Stucchi 1950 S.r.l. catalogs and technical brochures

  1. M1-Detailing

    3  Pages

  2. ST-Art C5/C10

    3  Pages

  3. ME-2

    3  Pages

  4. ME-1P

    3  Pages

  5. ME-1

    3  Pages

  6. ST4-TF

    3  Pages

  7. ST-152 EX

    2  Pages

  8. M1-COMBI

    3  Pages

  9. M1

    2  Pages

  10. ST3-GV

    3  Pages

  11. M1-SMALL

    3  Pages

  12. M1-SMARTY

    3  Pages

  13. ST2-COMBI

    4  Pages

  14. M1-JOLLY

    3  Pages

  15. ST2-TF

    3  Pages

  16. ST2-TF EX

    3  Pages

  17. ST2-C

    4  Pages

  18. ST1-C

    5  Pages

  19. ST1-P

    4  Pages

  20. ST3-TF

    3  Pages

  21. ST-DUSTY

    2  Pages

  22. ST-BACK

    2  Pages

  23. AIRone

    2  Pages

  24. ST-300 EX

    2  Pages

  25. ST3-GV EX

    3  Pages

  26. ST-22 EX

    2  Pages

  27. ST-vAIR

    2  Pages

  28. ST4-TF EX

    3  Pages

  29. PZP-MP

    3  Pages

  30. ME-2PD

    4  Pages

  31. STM-TF

    3  Pages

  32. MP-2

    3  Pages

  33. MP-D

    2  Pages

  34. MP-CM

    3  Pages

  35. MP-C

    3  Pages

  36. ESM-PT

    3  Pages

  37. ESM-T

    3  Pages

  38. EM

    3  Pages

  39. PZP-1

    3  Pages

  40. PZP

    3  Pages

  41. PZ

    3  Pages

  42. PZ-MP

    3  Pages

  43. B6

    3  Pages

  44. B5

    3  Pages

  45. ST-BIN

    3  Pages

  46. BIN-CA-06

    3  Pages

  47. ST7-TF INV.

    3  Pages

  48. ST7-TF

    3  Pages

  49. ST5-TF

    3  Pages

  50. ME-2P

    3  Pages

  51. ME-1P COMPACT

    3  Pages

  52. ME-1 COMPACT

    3  Pages

  53. ST2-M

    3  Pages

  54. ST1-M

    3  Pages

  55. ST7-TF EX

    3  Pages

  56. ST5-TF EX

    3  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.