1. Catalogs
  2. STARTER
  3. pile and mooring winches

pile and mooring winches

pile and mooring winches

pile and mooring winches

Product catalog summary
Objectives
Provide a comprehensive solution for barge operations including pile handling, anchor management, mooring line operations, and hydraulic power and control devices.
Challenges
The project involved high technical complexity within a constrained and compact environment. The STARTER team developed solutions and equipment with exceptional features, achieving operational status within six months to meet client requirements.
Project Overview
The project involved the development of a winching system and deck equipment for the KOSTALDEA, a dipper dredger used for seabed dredging. The client is a world leader in the construction industry with an annual turnover exceeding 30 billion euros, operating a fleet of over 200 floating plants.
Background
A global solution was provided with hydraulic winches and deck equipment, including pile winches, mooring winches, and various deck equipment such as windlasses and fairleads. The system also included articulated pulleys with pulling force measurement devices and a hydraulic power station with multiple motor pump sets.
Technical Specifications
  • Application: Piles lifting
  • Force: 40,000 daN - 80,000 daN
  • Speed: 8 m/min
Result
The barge is currently operational off the French coast.
See more

Catalog excerpts

pile and mooring winches-1

GLOBAL SOLUTION WITH HYDRAULIC WINCHES AND DECK EQUIPEMENT the STARTER teams achieved a winching system and deck equipment for the KOSTALDEA, a dipper dredger, destined to seabed dredging for a compagny ranks as world leader in the construction industry with an annual turnover of over 30 billion euros. The main fields of activity for this compagny are dredging, marine construction, civil engineering, pipelines and diving & underwater works. This compagny owns and operates a fleet of over 200 items of floating plant conferring leader status. Provide a comprehensive solution to all functions on the barge : operating piles, anchors, mooring line, providing hydraulic power and control devices. challenges High technical complexity in a constrained and very compact environment. The STARTER teams have developed solutions and equipment with exceptional features allowing the installation on this small ship. From the design phase to commissioning, the solution was operational in 6 months to meet the operating requirements of the client.

 Open the catalog to page 1
pile and mooring winches-2

GLOBAL SOLUTION WITH HYDRAULIC WINCHES AND DECK EQUIPEMENT A comprehensive set of equipment including: - Pile Winch (40 000 daN). - Mooring winches (5 000 daN). - Deck equipment (windlasses, fairleads, panama chocs, roller). - Articulated pulleys equipped with pulling force measurement devices (SWL: 46 tonnes). - Hydraulic power station, with 3 motor pump sets (75kW each) and an emergency set (30 kW). - Control system displaying in real time the pulling force on the piles. result The barge is currently operating off the French coast. TECHNICAL SPECIFICATIONS : Application : Piles lifting. Force...

 Open the catalog to page 2
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.