gas cube
16Pages

{{requestButtons}}

Catalog excerpts

gas cube - 1

Spencer GasCube Natural Gas Booster Skid Package ® Serial No: System No: Model No: Installation, Operation and Maintenance Instructions GasCube with heat exchanger, recirculation loop and automatic valve. GasCube with recirculation loop and manual valve. Important This manual contains information you need for handling, installing, operating and maintaining your new equipment correctly, to ensure trouble-free operation and long service life. Read and become familiar with it before installation of your Spencer GasCube® skid package. Following these instructions will help you realize its full potential of efficient service and extended lifespan and will help avoid any damage that could void your warranty. The Spencer Turbine Company Windsor, Connecticut 06095

Open the catalog to page 1
gas cube - 2

I Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Product Description. . . . . . . . . . . . . . . . . . . . . . . . . 3 II Limited Warranty. . . . . . . . . . . . . . . . . . . . . . . . . . 3 III Safety Precautions & Operating Guidelines. . . . 3 IV Handling and Storage. . . . . . . . . . . . . . . . . . . . . . 4 Lifting and Moving. . . . . . . . . . . . . . . . . . . . . . . . . . 4 Storage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Unpacking. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 V Installation. . . . . . . ....

Open the catalog to page 2
gas cube - 3

Control Panel Recirculation Valve Heat Exchanger GAS OUTLET Recirculation Loop Pressure Gauge Pressure Switch Expansion Joint Plug Valve Rotation Inspection Port Protective Plate (Spencer trademarked sugar-scoop design) Skid Base Product Description The standard components of a GasCube package include a UL Listed Spencer natural gas booster, a UL Listed 508A control panel for automatic operation, isolation valves, expansion joints, gauges, and a recirculation loop. Larger capacity GasCube models include a gas to air intercooler and automatic valve in the recirculation loop. At the heart of...

Open the catalog to page 3
gas cube - 4

• Perform all installation and operating procedures with care, following sound safe-work practices to avoid accidents and damage. • Avoid climbing on or over the GasCube equipment; use proper staging and ladders for exterior machine access. • Be sure isolation pads are placed beneath the GasCube skid. • GasCube packages include flexible connectors on inlet and outlet flanges to isolate piping loads from the gas booster. • Ensure that piping and accessories such as check valves are properly installed and fastened. • Allow only qualified electricians to work on electrical equipment. • Lock...

Open the catalog to page 4
gas cube - 5

are unobstructed before connecting piping to blower. 1. Piping The Spencer GasCube package contains at its heart a Gas Booster Series GL that is UL Listed as suitable for installation in accordance with the provisions of the National Electric Code, NFPA No. 70, and the National Fuel Gas Code, NFPA No. 54, for natural gas only. All piping connected to the GasCube package should be sized to minimize friction loss. All system joints must be gastight. All piping must be properly aligned and supported to avoid stress on the GasCube components and anchored adequately to prevent movement away from...

Open the catalog to page 5
gas cube - 6

VI. Operation and Adjustments Startup Precautions IMPORTANT NOTE: Before operating a new GasCube package for the first time, review the installation and setup procedures to be sure that no steps have been overlooked. 1. Installation Check List • Is there any damage from transportation or installation? • Is the package level? • Have all packing, shipping materials and tools been removed? • Have inlet and outlet pie-plate covers been removed? • Are isolation pads in place? • Is the piping connected and supported? • Are flexible connectors in place between the gas booster and piping? • Is the...

Open the catalog to page 6
gas cube - 7

in unnecessary delays. When in doubt, consult the Spencer Aftermarket Sales Department for further information. When ordering parts, furnish the following: • GasCube package serial and system numbers. VIII. Troubleshooting Guide • Motor horsepower. If your GasCube package is not delivering rated pressure, but motor is not overloaded, check the following: • Part nomenclature — refer to the applicable diagram (pages 8-14) and locate the needed item by its number and name. 1. Correct and reversed rotation will produce two different delivery pressures, the higher pressure indicating correct...

Open the catalog to page 7
gas cube - 8

GasCube Series 21 without Heat Exchanger Single-stage 20" Diameter Casing, 3" Diameter Pipe 2. Inlet and outlet connections are 3" flange • 8 The Spencer Turbine Company ♦ 600 Day Hill Road, Windsor, CT USA 06095 ♦ TEL 800-232-4321 ♦ 860-688-8361 ♦ www.spencerturbine.com

Open the catalog to page 8
gas cube - 9

GasCube Series 21 without Heat Exchanger Single-stage 20" Diameter Casing, 4" Diameter Pipe GasCube System Part No.'s: SYS90150, SYS90151, SYS90152, SYS90153, 2. Inlet and outlet connections are 4" flange - 150# drilling. The Spencer Turbine Company ♦ 600 Day Hill Road, Windsor, CT USA 06095 ♦ TEL 800-232-4321 ♦ 860-688-8361 ♦ www.spencerturbine.com 9

Open the catalog to page 9
gas cube - 10

GasCube Series 20 without Heat Exchanger Multistage 20" Diameter Casing, 4" Diameter Pipe 2. Inlet and outlet connections are 4" flange ■ 10 The Spencer Turbine Company ♦ 600 Day Hill Road, Windsor, CT USA 06095 ♦ TEL 800-232-4321 ♦ 860-688-8361 ♦ www.spencerturbine.com

Open the catalog to page 10
gas cube - 11

GasCube Series 24 without Heat Exchanger Multistage 24" Diameter Casing, 6" Diameter Pipe 2. Inlet and outlet connections are 6" flange - 150# drilling. The Spencer Turbine Company ♦ 600 Day Hill Road, Windsor, CT USA 06095 ♦ TEL 800-232-4321 ♦ 860-688-8361 ♦ www.spencerturbine.com 11

Open the catalog to page 11
gas cube - 12

GasCube Series 24 with Heat Exchanger Multistage 24" Diameter Casing, 6" Diameter Pipe 2. Inlet and outlet connections are 6" flange - 150# drilling. 12 The Spencer Turbine Company ♦ 600 Day Hill Road, Windsor, CT USA 06095 ♦ TEL 800-232-4321 ♦ 860-688-8361 ♦ www.spencerturbine.com

Open the catalog to page 12

All Spencer Turbine Company catalogs and technical brochures

  1. AA15.1

    20 Pages

  2. GG7

    2 Pages

  3. LL6

    2 Pages