Technical data sheet TDS SSI 30 Version 3.0 Revision : 03.02.2021 Silcrete SSI 30 — Design Floor / Industrial color floor Self-leveling design floor. Hardens fast and tension-relieved with a layer thickness of 2 - 40 mm. Eco-Binder technology environmentally friendly mineral fast curing and tension-relieved resistance against salt water and chemicals high flowability high abrasion resistance easy application also processible by machine • for revision of concrete and screed • suitable for critical undergrounds • applicable in layer thicknesses of 2 - 40mm, for large areas a layer thickness of aprox. 3-5mm is recommended • Cement and calcium sulfate-based screed, heated and non-heated • Self-leveling compounds, floor filling compounds • Adhering ceramic coverings Prior to coating, ensure that the surface is stable and has sufficient surface tensile strength. The surface should also be ready for coating, dry or matt damp, clean and free from all kinds of debris. Mechanical surface preparation e.g. shotblasting is recommended. Due to roughening the surface, the adhesion for the subsequent layer can be improved. Deeper ruptures must be filled with Silcrete MV 035. The surface should be permanently vibration-free and crack-free. Therefore, new concrete or screed should have a minimum age of 28 days. Already existing cracks must be repaired professionally. The adhesive strength of the substrate must be at least 1.5 N/mm2. The substrate has to be dry for priming, and dried for 2 hours after priming with Silcrete SSI PRIM. By priming the surface, the absorbency of the substrate is adjusted. This avoids the rising of air bubbles during the subsequent coating. In order to guarantee this on critical undergrounds, a test area of 1m2 should be created. Apply a further layer of primer if necessary. The coating work on the primer has to be finished within 6 hours. Please refer to the technical data sheet of Silcrete SSI PRIM for more information. The edge joint must be prepared with a suitable expansion strip. Thereby attention must be paid to a clean adhesion to avoid material flowing below or behind the expansion strip. Expansion joints must be adopted. After finishing all coating works, all joints have to be filled with a permanently elastic compound. Transitions and closing edges should be protected against over- flow by installing end rails. For coatings on tiled floors the surface has to be pre-leveled with Silcrete SSI 30. For this purpose, Silcrete SSI 30 is applied by a toothed spatula or a screed rake. The layer thickness above the tile surface should be at least 1 mm. The joint profile has to be fully covered. After curing time of approximately 6 hours the
Open the catalog to page 1Technical data sheet TDS SSI 30 Version 3.0 Revision : 03.02.2021 surface can be primed with Silcrete SSI SPRIM. The application of the primer with all respective waiting times has to be handled according to the normal substrate preparation. Due to the application on tiled floors attention should be paid to a crackfree underground. Loose tiles and tiles over cavities must be removed. For simultaneous work on various substrates with changing absorbencies the surface has to be pre-leveled to maintain a uniform coloring of the mortar. For this purpose, Silcrete SSI 30 is applied by a toothed spatula...
Open the catalog to page 2Revoxia Sarl Self-leveling industrial floor. Hardens fast and tension-relieved with a layer thickness of 2 - 40 mm. Fire behavior Technical data sheetTDS SSI 30 Version 3.0 Revision : 03.02.2021Packaging and shelf-life 25 kg paper bag Item N° : SSI3025 Original packing is storable for 12 months in dry and controlled temperate areas (not below 0 °C, recommended 10 - 25 °C). Reseal opened containers immediately and use within a very short time. There is no mandatory hazard labeling for Silcrete SSI 30. Avoid inhaling dust when opening packaging. Protect skin and eyes during the mixing process....
Open the catalog to page 332 Pages
6 Pages
6 Pages
2 Pages
3 Pages
3 Pages
2 Pages