The Sarens Multi Lifting Tower (SMLT) is a versatile, free-standing tower system used for heavy lifting operations. It can be configured as a single tower or multiple towers with lifting beams, often in conjunction with Strand Jacks. The design accommodates both vertical and horizontal loads, offering a modular and flexible solution tailored to specific lifting needs. The tower sections are transportable via standard trucks, and Sarens owns sections totaling 600 meters in length. A standard 100-meter high SMLT can lift up to 6,000 tons, providing a cost-effective option for heavy lifting projects. Safety and quality are prioritized, adhering to ISO/OHSAS standards.
Reference Projects
  • Stord, Norway: Load-out and lifting of two drilling rigs using 8 SMLTs (12m x 12m, 42m high) with a total lifted weight of 10,900 tons.
  • Ulsan - Gunsan, South Korea: Lifting of two Goliath cranes using 2 SMLTs (12m x 12m, 130m high) with a lifted weight of 5,900 tons.
  • Thornton Bank, Belgium: Offshore installation of six 5MW windmills using 1 SMLT (12m x 12m, 38m high) equipped with LR1750.
  • Port Arthur, Texas, USA: Reactor exchange using 2 SMLTs (12m x 12m, 42m high) and 1 SMLT (26m x 12m, 60m high) with a design capacity of 1,500 tons.
  • Solna, Sweden: Swedbank Arena construction using 4 SMLTs (12m, 51m high) with a lifted weight of 500 tons.
See more

Catalog excerpts

Leaflet SMLT-1

www.sarens.com - [email protected] Thornton Bank - Belgium Sarens Multi Lifting Tower The basic principle of the Sarens Multi Lifting Tower (SMLT) is a free standing tower (without guy wires or bracings) or multiple towers with lifting beams on top, often used in combina t ion w i t h S t rand Jacks. The towers are designed to withstand both vertical and horizontal loads. The SMLT’s modular design is flexible in use and therefore capable of providing a tailor-made solution for each heavy lifting problem. The tower sections can be transported on standard trucks. The Sarens Group currently owns tower sections equivalent to 600m. A standard SMLT of 100m high has a capacity up to 6.000t. Truly a costeffective solution for your heavy lifting needs. Safety and quality are paramount to our company and all works are executed to the highest ISO/OHSAS standards.

 Open the catalog to page 1
Leaflet SMLT-2

www.sarens.com - [email protected] Solna - Sweden Ulsan - Gunsan - South Korea Stord - Norway Sarens Multi Lifting Tower Reference projects: • Stord, Norway: Load-out and lifting of 2 drilling rigs H6 8 SMLT (12m x 12m - height 42m) - lifted weight 10.900t • Ulsan - Gunsan, South Korea: Lifting of 2 Goliath cranes 2 SMLT (12m x 12m - height 130m) - lifted weight 5.900t • Thornton Bank, Belgium: Offshore installation of 6 windmills 5MW each 1 SMLT (12m x 12m - height 38m) - equipped with LR1750 • Port Arthur, Texas USA: Exchange of a reactor 2 SMLT (12m x 12m - height 42m) and 1 SMLT (26m x 12m...