The document introduces the Sarens Climbing System 5000 (CS5000), an in-house designed method for lifting ultra-heavy modules and structures, developed by the second Sarens generation around the 1960s.

CS5000 Specifications
  • Design: In-house design focused on lifting ultra-heavy modules.
  • Jacking Capacity: 5,000 tons per tower.

Advantages
  • Fully containerised system with a limited footprint.
  • High level of control from a central computer ensuring 100% ground-controlled safe jacking.
  • Safety performance level E.
  • Automatic feeding system with a jacking stroke of 1,100mm.
  • Multiple tower set-ups available.

Working Principle
  • The system is a self-climbing lifting tower built while jacking.
  • Jacking is done with elements of 1 meter.
  • Lifting is achieved by means of four jacks per tower, composed of hydraulic cylinders combined with a hydraulic locking system.

Solutions
  • Designed for jacking super heavy weights to meet the needs for full modularisation.
  • Capable of handling challenging super heavy weight items.
  • Custom-made solutions available.

Conclusion
At Sarens, the focus is on delivering maximum performance and achieving perfection in every project. Heavy lifting is considered a high craft, with a dedication to innovation and the quest for flawless project delivery.
See more

Catalog excerpts

CS5000-1

SARENS CLIMBING SYSTEM 5000 • DISCOVER OUR CS5000 - in-house design - method for lifting ultra-heavy modules and structures - jacking capacity of 5.000T per tower • ADVANTAGES - fully containerised - limited footprint - high level of control from central computer - 100% ground-controlled safe jacking - safety performance level E - automatic feeding system - jacking stroke of 1.100mm - multiple tower set-ups THE SECOND SARENS GENERATION, CIRCA 1960S NOTHING TOO HEAVY, NOTHING TOO HIG

 Open the catalog to page 1
CS5000-2

• WORKING PRINCIPLE - self-climbing lifting tower built while jacking - jacking with elements of 1m - lifting by means of four jacks per tower - jacks are composed of hydraulic cylinders combined with hydraulic locking system • SOLUTIONS - jacking of super heavy weights to meet the needs for tendency towards full modularisation - challenging super heavy weight items - custom-made AT SARENS, WE COUNT ON PROFESSIONALS WHO DELIVER MAXIMUM PERFORMANCE, ACHIEVING PERFECTION IN ANY PROJECT THEY UNDERTAKE. FOR US, HEAVY LIFTING IS A HIGH CRAFT. FOR US, EXCELLENCE IS DEDICATION TO INNOVATION AND THE...