SARENS CLIMBING SYSTEM 250 • DISCOVER OUR CS250 - in-house design - method for lifting heavy loads - lifting capacity of 250T per tower • ADVANTAGES - fully containerised - limited footprint - jacking stroke of 150mm - low starting height - jacking elements shifted in by manual handling - multiple tower set-ups AT SARENS, WE HAVE THE GLOBAL MISSION TO BE THE GLOBAL REFERENCE IN CRANE RENTAL SERVICES, HEAVY LIFTING, AND ENGINEERED TRANSPORT FOR OUR CLIENTS NOTHING TOO HEAVY, NOTHING TOO HIG
Open the catalog to page 1• WORKING PRINCIPLE - self-climbing lifting tower built while jacking - jacking with elements of 125mm - lifting by means of one jack per tower - jacks are composed of hydraulic cylinders combined with hydraulic locking system - in combination with bracing system • SOLUTIONS - pre-jacking before transport or installation - custom-made EXAMPLES OF JACKING OPERATIONS WITH THE CS250 NOTHING TOO HEAVY, NOTHING TOO HIG
Open the catalog to page 22 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
12 Pages
12 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
36 Pages
2 Pages
2 Pages
2 Pages
36 Pages
2 Pages
2 Pages
2 Pages
8 Pages
16 Pages
4 Pages
4 Pages
4 Pages
4 Pages
4 Pages
4 Pages
4 Pages
4 Pages
4 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages