Steel anchor
Open the catalog to page 1Thank you for purchasing (or planning to purchase) our innovative device! We are convinced that with the help of our product - the FUKA dryer - you will take your car wash to the next level. To ensure long and trouble-free use of our product, the final installation site of the FUKA dryer must be properly prepared. Here are the basic requirements for preparing such a site: Preparing the electrical connection The place prepared for the installation of the device must be supplied with stable power supply with minimum voltage of 230V (1 phase) using a cable of the appropriate crosssection: • for cable...
Open the catalog to page 2Attaching the machine to the ground In order to ensure maximum stability of the device during normal use, a proper foundation for the installation should be prepared in advance. Steel anchor + concrete foundation At least 7 days prior to the scheduled installation of the device, the concrete foundation must be constructed in accordance with the specifications below and with use a steel anchor previously supplied by the device manufacturer. To do this, you need to make a trench measuring minimum 70cm x 50cm and 120 cm deep. The power cable must be led into the trench in accordance with the specifications...
Open the catalog to page 3Power cable
Open the catalog to page 4height: 3,2 m arm lenght: 2,9 m housing width: 0,5 m InnoSync s.r.o. Fuka – Mind Blowing Solutions Rybna 716/24, 110 00 Prague, Czech Republic mail: [email protected] tel: +420 776 747 716 www.airfuka.com
Open the catalog to page 52 Pages
2 Pages
2 Pages
34 Pages
1 Page
2 Pages
1 Page