1. Catalogs
  2. PTC
  3. Windchill_Cost
video corpo

Windchill_Cost

Windchill_Cost

Windchill_Cost

Product catalog summary
Overview
Windchill Cost is a tool designed to help manufacturers track and manage both target and actual costs throughout the product development lifecycle. It provides real-time cost visibility, enabling efficient tracking of parts and products, analyzing cost impacts of design alternatives, and ensuring products are launched at target costs to optimize profit margins.
Challenges in Cost Management
Manufacturers often struggle with accurately tracking and communicating product costs early in the development process due to frequent changes in the bill-of-material (BOM), part design, and suppliers. Traditional costing methods are often disconnected from the actual BOM managed in enterprise systems like PLM, leading to manual tracking and limited visibility for engineers.
Solution: Windchill Cost
Windchill Cost integrates cost analysis into the product development process, providing real-time cost estimates and enabling industry best practices. It supports various cost models for different lifecycle stages and consolidates cost information for different BOM configurations, empowering users to make informed decisions to meet cost targets.
Key Benefits
  • Launch at Target Costs: Real-time cost analysis during the design process helps ensure products are launched at or under target costs.
  • Comprehensive Cost Analysis: Provides cost analysis for all product configurations, including options and variants, with visual representations of cost targets.
  • Improved Margins: Real-time cost assessments throughout the development process enable better decision-making and identification of cost-saving opportunities.
  • Design to Cost: Features like cost breakdown analysis and what-if scenarios help engineering teams explore better design alternatives, leading to innovation and reduced costs.
Features
  • Multiple Cost Estimation Techniques: Supports recording multiple cost estimates per part based on actual, estimated, or projected costs.
  • Reporting and Analytics: Generates reports to manage cost targets and analyze cost drivers, including Pareto Analysis.
  • Systems Integration: Integrates with PLM and ERP systems for seamless product costing within the development process.
Platform Specifications
  • Server Operating Systems: Windows 2008, Solaris 10, HP-UX 11i, Red Hat Enterprise Linux 5
  • Java: Version 1.6 and higher
  • Browser: Internet Explorer v7.0 and higher, Mozilla Firefox v3.0 and higher
  • Database: Oracle 11g R2, Microsoft SQL Server 2008
  • Languages: English, Chinese (Simplified and Traditional), French, German, Japanese, Korean
Learn More
For more information, visit: PTC.com/products/windchill/productanalytics
See more

Catalog excerpts

Windchill_Cost-1

the product development company® Data Sheet WindchilP Cost REDUCE PRODUCT COSTS AND IMPROVE PRODUCT MARGINS Windchill Cost allows manufacturers to track both target and actual cost, and provide real-time cost visibility throughout the product development lifecycle. Now you can efficiently track the cost of all parts and products, analyze the cost impact of design alternatives, and empower users to ensure products are launched at target cost. The result: optimized profit margins. While product cost is a major concern for manufacturers, the majority of companies struggle to accurately track, measure, and communicate it beginning early in the product development process, where cost decisions have the greatest impact. This difficulty is due to the complexity introduced by frequent changes to the bill-of-material (BOM), part design, and suppliers. While there are specific costing methods and tools that generate data to help estimate cost, they are usually relevant only at select stages of the product lifecycle. Furthermore, these tools are disconnected from the actual BOM that is managed in key enterprise business systems, such as PLM (product lifecycle management). Consequently, changes either to the BOM or to the approved manufacturers list, for example, are typically tracked manually, and the results are not readily visible or accessible to engineers when they're making decisions regarding new parts An efficient product development process relies on automatically incorporating product changes in cost analysis. This approach not only creates accurate, up-to-date cost reports, but also allows cost analysis to be performed on every product design change and product configuration. Enter Windchill Cost-a solution that enables industry best practices and delivers real-time product cost estimates throughout the entire product development lifecycle. Windchill Cost delivers a number of important benefits: it makes product cost analytics an integral part of the standard product development process; it complements existing cost-estimate tool investments by utilizing different cost models for parts and assemblies based upon lifecycle stage; and it rolls up cost information for different BOM configurations. Above all, Windchill Cost empowers users to make smarter decisions to ensure that products meet all cost targets. Cost Status (Cost Model compared to Target Cost) Cost Rollup Estimate $206.82 Target Cost Cost Estimate Status Cost Estimate Confidence Part Cost Cost Model Total Cost by Estimate Type Improve product decisions by understanding the cost impact of change throughout the standard development process. Page 1 of 3 | Windchill Cost

 Open the catalog to page 1
Windchill_Cost-2

Data Sheet Launch products at - or under - target costs With traditional costing methods, manufacturers often wait until after the product design has been completed before they estimate product costs, so they can avoid the difficulties of incorporating frequent product changes. Unfortunately, by the time a design is complete, the majority of product costs have already been locked-in, resulting in missed targets and costlier products. A more efficient solution is to leverage real-time cost analysis in a design-to-cost process. Using Windchill Cost, product designers and other stakeholders can...

 Open the catalog to page 2
Windchill_Cost-3

Data Sheet Multiple Cost Estimation Techniques Windchill Cost allows users to record multiple cost estimates per part. Costs can be based on actual cost from an ERP system, estimates from the engineering group, or future projected costs. Windchill Cost generates reports showing if parts and products meet cost targets, with analysis to support product costing • Manage cost targets, multiple cost estimates per part, and estimate confidence level for each part • Quickly identify products that are over cost targets and view visual feedback of the parts within a product that • Drill down into cost-breakdown...

 Open the catalog to page 3

All PTC catalogs and technical brochures

  1. Arbortext_Bro

    14  Pages

  2. View Toolkits

    3  Pages

  3. Creo_Layout

    2  Pages

  4. Direct_DS

    3  Pages

  5. Creo_Simulate

    3  Pages

  6. Integrity

    4  Pages

  7. Windchill

    8  Pages

Archived catalogs

  1. Arbortext

    10  Pages

  2. Windchill

    10  Pages

  3. Pro/ENGINEER

    10  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.