WHEN SPACE FOR LIFTING IS MISSING When Hans was looking for a solu�on that could safely li� 6 meter long pipes weighing 120 kg, 3,4 meters up for moun�ng, it was only Pronomics Li�&Drive that was up for the

 Open the catalog to page 1
Customer Case Subterra-2

ABOUT SUBTERRA THE CHALLENGE Subterra is moun�ng the pump system for draining storm-water from the tunnels that are built as a part of the E4 Stockholm Bypass project. They contacted us when they needed to li� 6-meter-long drainpipes for moun�ng behind concrete walls down in the tunnels. ”Usually we mount the pipe systems prior to pu�ng up the concrete walls, but unfortunately the fastening of the walls themselves required these be mounted first prior to a�aching the pipes. This resulted in a new challenge for us as it created a narrow culvert with limited space for working” Hans Torstenson explains....

 Open the catalog to page 2
Customer Case Subterra-3

WORK ENVIRONMENT AWARD The Swedish Transport Administra�on take the work environment very seriously and are working according to a ”Vision Zero”. To encourage all sub contractors to work ac�vely to reach this vision they have amongst other ini�a�ves created the Work environment award. Vision Zero states that ”no one will be injured, die in an accident or suffer from illness at work.” According to the Swedish Transport Administra�on the responsibility for the work environment in construc�on and excava�on work is shared by several different par�es who collaborate to create a good and safe work...