About Us - Presentation
10Pages

{{requestButtons}}

Catalog excerpts

About Us - Presentation - 1

WASTE MANAGEMENT SIMPLLIFIED

Open the catalog to page 1
About Us - Presentation - 2

WASTE MANAGEMENT SIMPLLIFIED Our production plant consists of 6 halls and 1 administrative section, which are interconnected 1.Hall : It is divided into warehouse and CNC machining division. 2.Hall : The electrical workshop, saw section and hydraulic cylinder manufacturing section. 3.Hall : Rescue, sliding and fixed body manufacturing department, Vacuum Truck and Combined group manufacturing department, and Fire Brigade manufacturing department. 4.Hall :Cnc Plasma Cutting, Auxiliary Subframe and Chassis production, Cilindrical Tank Chamber for Vacuum Equipments. 5.Hall :Tail Gate for Refuse...

Open the catalog to page 2
About Us - Presentation - 3

WASTE MANAGEMENT SIMPLLIFIED 1.Hall : It is divided into warehouse and CNC machining division. A) In the warehouse section, stocks of spare parts we need in the production of our equipment and after-sales services are kept, and direct sales of our spare parts are also made. B) In CNC section: pipes of hydraulic cylinders of our equipment, pin and bushing connections, Machining of castamide polyamide materials, processing of cast parts (water pump parts, etc.), machining of parts processed from laser and plasma machines, etc. transactions are made. Our water pump installation, which is...

Open the catalog to page 3
About Us - Presentation - 4

WASTE MANAGEMENT SIMPLLIFIED 2.Hall : The electrical workshop, Sawing section and hydraulic cylinder manufacturing section. A) The electrical installation assemblies of our equipment produced in the electrical workshop are prepared, checked and mounted on the equipment. Apart from this, electrical maintenance and electrical faults of the vehicles sold are eliminated and system installations are produced according to customer demands. B) In our sawing department, profiles and pipes used in our production are cut according to the desired dimensions. There are 2 band saws, 1 CNC laser profile...

Open the catalog to page 4
About Us - Presentation - 5

WASTE MANAGEMENT SIMPLLIFIED 2023 3. Hall: Rescue, sliding and fixed body manufacturing department, Vacuum truck and combined group manufacturing department, and fire brigade manufacturing department. A) Rescue truck manufacturing division ,Crane rescuers, fixed and sliding boxes (body) are manufactured in this department. B) Vacuum truck and combined manufacturing department, after the tanks and cambers of our equipment are welded in the 4th Hall, their production is continued by coming to the 3rd Hole and the hydraulic installation works after painting are completed in this department. C)...

Open the catalog to page 5
About Us - Presentation - 6

WASTE MANAGEMENT SIMPLLIFIED 2023 4.Hall : Cnc Plasma Cutting, Auxiliary Subframe and Chassis production, Cilindrical Tank Chamber for Vacuum Equipments. A) We have 2 cnc plasma lines, 1 cnc press brake, 1 press and 1 guillotine shear machines and the cuts of our sheets required for production are made in our plasma line, and the sheets are made ready to start production by bending them in press machines. B) Auxiliary subframes of our garbage equipment are welded. The body parts of the garbage equipment are made ready by combining the side walls with the floor and floor sheet. It is then...

Open the catalog to page 6
About Us - Presentation - 7

WASTE MANAGEMENT SIMPLLIFIED 5.Hall : The tail gate of garbage equipment, Container lifting systems, Garbage disposal shovels and oil tanks are produced. The oil tanks are mounted on the body and the hydraulic electrical installation of the body is carried out. The hydraulic installations of the tail gates are done, then the body and the Tail Gates are transferred to the 6th Hole for assembly.

Open the catalog to page 7
About Us - Presentation - 8

WASTE MANAGEMENT SIMPLLIFIED 6.Hall : Tail Gate and Body Assembly Line and Painting Department A) Tail Gate and body assembly line After the tail gate and body shipped from the 5th hall are sandblasted in the paint section, the primer process is applied before painting. The primed tail gate and body are taken to the assembly line and assembly processes are completed. The products whose final controls are made before painting are placed in the paint queue.

Open the catalog to page 8
About Us - Presentation - 9

WASTE MANAGEMENT SIMPLLIFIED 6.Hall : Tail Gate and Body Assembly Line and Painting Department B) Paint Shop The products, whose pre-painting processes are completed, are taken to the paint shop in order of production. Before the painting process, the equipment is sandblasted and free of oil and burrs, and a clean surface is obtained for the painting process. Primer is applied before painting. Afterwards, the equipments, which are painted with 2 boots, are dried in the ovens. After the painting process, the hydraulic and electrical installations of the equipment are completed. The...

Open the catalog to page 9
About Us - Presentation - 10

WASTE MANAGEMENT SIMPLLIFIED

Open the catalog to page 10

All Procompactor Waste Management Equipment catalogs and technical brochures