SCTOCA Site Preparation Guide 2010 © Peak Scientific - F
Open the catalog to page 1Site Preparation GuideContents Customer Responsibilities 3 Safety Notice to Users 5
Open the catalog to page 2SC-TOC-A Site Preparation Guide Customer Responsibilities To ensure a successful and timely installation of your Peak generator, please refer to this set of requirements. Correct site preparation is the first key step in ensuring that your generator and systems operate reliably over an extended lifetime. This document is an information guide and checklist that outlines the requirements for your site. It is essential your site meets the following specification prior to the installation date. For details, see specific sections within this document The necessary spatial requirements are met. The...
Open the catalog to page 3Site Preparation GuideChange History Rev.
Open the catalog to page 4Site Preparation Guide Safety Notices Symbols This manual uses the following symbols to highlight specific areas important to the safe and proper use of the Generator: Safety Notice to Users This site preparation guide must be read thoroughly and ./■ A understood before installation and operation of your Peak / , \ SCTOCA Generator. Incorrect preparation or use of the Generator in a manner not specified by Peak Scientific MAY impair the SAFETY provided by the equipment. When handling, operating or preparing for installation, ;; ; personnel must employ safe practices and observe all relevant J...
Open the catalog to page 5Site Preparation GuideTechnical SpecificationEnvironment Minimum operating ambient temperature *NOTE - When taken out of storage the Generator should be allowed to acclimatize at room temperature for a minimum of 3 hours before operation. Generator Outlets General Generator dimensions in cm (inches) W x D x H
Open the catalog to page 6SC-TOC-A Site Preparation Guide Site preparation Environmental control If the generator is stored in an enclosed space the environment must be controlled via an air conditioner or extraction fan. Generator MUST NOT be stored or installed outside.
Open the catalog to page 7Failing to provide adequate cooling space around the generator may cause damage to the membranes and cause the compressors to run continually. This will reduce service life and invalidate warranty.
Open the catalog to page 8Site Preparation GuideElectrical requirements The below power cables are supplied with the generator. For cables pertaining to countries not displayed above, it is the responsibility of the end user to provide an appropriate power cable which meets the requirements defined in the Technical Specification section on page 6. A This unit is classified as SAFETY CLASS 1. THIS UNIT MUST BE EARTHED. Before connecting the unit to the mains supply, please check the information on the serial plate. The mains wARwiwGi supply must be of the stated AC voltage and frequency. If the mains power at your location...
Open the catalog to page 9SC-TOC-A Site Preparation Guide The power cable supplied with the generator is 2.5m long. A mains socket providing the power should be located adjacent to the generator and within a 2m radius to the generator.
Open the catalog to page 10SC-TOC-A Site Preparation Guide On-Site Transit When moving the generator in its shipping crate, doorways and other openings such as elevators must fit with the sizes in the figure below.
Open the catalog to page 11SC-TOC-A Site Preparation Guide Unpacking Space Required The image below shows the minimum space required to unpack the generator from its shipping crate. Tools Required : Drill with Pozidrive #2 Bit Unpacking Remove all screws encircled in red, use Drill or Pozidrive #2 screwdriver. Once the screws have been removed, lift the upper half of the crate.
Open the catalog to page 12Site Preparation Guide Tubing lengths Tubing sizes should be chosen with accordance to the diagram below. I The diameter of the tubing which will be connected to the gas outlet is important and is determined by the length of tubing required. Failure to follow these recommendations could lead to accelerated compressor wear. Copper Tubing
Open the catalog to page 13SC-TOC-A Site Preparation Guide Drainage Connect the 2m Nylon tube to the drain outlet, ensure the tube is pushed fully in and gripped securely by the fitting. Fit the other end of the drain line to a suitable drain connection or container. Ensure that the container is emptied regularly, before full. Containers must not be airtight.
Open the catalog to page 14Peak Scientific India 202, Amsri Shamira Old Lancer Line Opp. St. Mary's Degree Colleg S.D. Road Secunderabad 500 025, India Tel: +91 (0)40 2780 0663 Fax: +91 (0)40 2780 0663 Peak Scientific Mexico Solon 352 Col. Los Morales Polanco 11530 Mexico, D.F. Mexico Tel: +1 866 647 1649 Peak Scientific Africa Block D, Unit D40 The Grove Business Estate e Old Paardevlei Road Somerset West 7130, South Africa Tel: +27 (0)2185 16542 Fax: +27 (0)8654 64473 Peak Scientific Australia PO BOX 65 Belmont Victoria 3216 Australia Tel: +61 1300 965 352
Open the catalog to page 158 Pages
2 Pages
2 Pages
2 Pages
2 Pages
8 Pages
2 Pages
44 Pages
2 Pages
2 Pages
12 Pages
16 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
44 Pages
2 Pages
2 Pages