NeoR - Product Information
20Pages

{{requestButtons}}

Catalog excerpts

NeoR - Product Information - 1

paschal.com UNmit Lang N ICH TE MA G 1 ier m Ma G. ny for of rk t We s in a nsen o AL ie CH d part itten c S f PA to thir he wr t ty o per losure hitout ro is p d disc ed w g win a n llow dra ion ot a his oduct r is n T e pr Re tsoev ietor. ha ropr w p the m rG aie . M form rk G ny t of We in a en AL arties cons n CH AS ird p ritte of P to th the w re ut erty rop losu hito is p disc d w ing nd llowe a raw n a s d ctio not Thi rodu er is p Re tsoev ietor. a wh propr the MA G 1 gloch N an NU it L ICH cm m ZE ern BE 150 öch 15x ngl hern 15x cm löc n t La cke e 150 m mi Lang öcher l c k it ene Inn enec x150 m m Lang hern

Open the catalog to page 1
NeoR - Product Information - 2

NeoR Lightweight formwork Less weight, more performance OBLONG HOLES AND KEYBOLT HOLES INTEGRATED HANDLE Height offset of the panels on uneven installation surfaces can be performed up to 2cm in a 15cm grid via oblong holes in the panel frame. Thanks to the integrated handle and the light weight this formwork can be assembled and moved easily by hand. INTERNAL TIE-POINTS The formwork can be used both vertically and horizontally. Therefore the panels 90 x 150cm and the large -size panel have additional internal tie-points. EXTERNAL TIE-POINTS The external tie-points guarantee the lowest...

Open the catalog to page 2
NeoR - Product Information - 3

The advantages Less weight *compared to Modular/GE universal formwork + can be moved easily by hand + low maximum weight of 40kg + universal fields of application + ideal for construction sites without a crane Higher maximum concrete pressure +40% more concrete pressure* 35kN/m² *compared to Modular/GE universal + 50kN/m² + fast concreting + high stability -35% lower frame depth* 12 cm *compared to a conventional formwork + only 7,5 cm frame depth + low storage volume + low transport volume + less transport costs Low-cost formwork ...because of low operating costs + low-cost connecting...

Open the catalog to page 3
NeoR - Product Information - 4

Well-balanced range of panels & accessories Perfectly coordinated element sizes ideal utilisation of the formwork storage by a well-balanced range of panels universal fields of application: foundations, columns, beams, walls a floor height of up to 3 m can be formed with just one extension using the panel height 150 cm formwork widths of 15 cm up to 90 cm in a 15 cm grid all panels can be combined both vertically and horizontally with each other in the same construction project with 5, 6 and 10 filler posts for residual compensations and matching plastic filler pieces, everything can be...

Open the catalog to page 4
NeoR - Product Information - 5

a floor height of up to 3 m can be formed without extension with the large-size panel or with just one extension with the 150 cm panel range large areas can be formed economically with the large-size panel 180 x 300 cm i.e. 5,4m² can be used both vertically and horizontally only 2 tie points on a height of 3m if it is tensioned on top Configuration example Universally and flexibly applicable Exposed concrete The lightweight formwork ensures a perfect concrete appearance less joints with the large size panel fewer tie points ensure an optimal concrete appearance, therefore ideal for exposed...

Open the catalog to page 5
NeoR - Product Information - 6

Compatibility Compatible with all PASCHAL systems Modular/GE universal formwork LOGO Wall formwork  the same frame depth as the Modular/GE universal formwork  easy to combine with the combi clamp  panels are connected via a filler post with the keybolt  common accessories are compatible  common accessories can be reused  cross profiles for fixing of same accessories  Height offset can be performed easily System properties Technical Data Technical Data Panel widths Panel heights Large-size panel Frame depth 12 mm finnish birch plywood (9-ply)  panels are connected via a filler post...

Open the catalog to page 6
NeoR - Product Information - 7

Miracle of space Low volume enables cheap transport The lightweight formwork NeoR has a very low volume per panel thanks to its small frame depth of only 7,5 cm This results in a low storage and transportation volume Accessories (such as the keybolt) also take up little space Example calculations: Example NeoR: 100 m² formwork area = 7,5 m³ storage/transportation volume Comparison to a conventional formwork: 100 m² formwork area = 12 m³ storage/transportation volume Miracle of transport The only large-size formwork that fits on a flatbed truck Due to the low weight and the ideal product...

Open the catalog to page 7
NeoR - Product Information - 8

Secuset A post for all cases Opposite lateral protection must be provided at the upper workplaces of the formwork from a fall height of 2.00 m. Secuset is the perfect choice for this: Versatile use (for wall formwork, slab formwork, at windows and doorways, on concrete slabs, at free slab edges and on wall tops) Easy and fast assembly Easy assembly of the lateral protection in 4 steps: 1. Attach support NeoR lateral protection on top part of panel. 2. Insert railing post with toe board support. Corresponds to the current security standard (DIN EN 13374) 3. Clip fences or 3 x 15 cm boards to...

Open the catalog to page 8
NeoR - Product Information - 9

Crane lifting clamp Easy to assemble and extremly load-bearing The crane lifting clamp KA is used as a lifting device to move individual panels or pre-mounted panel units of the lightweight formwork NeoR. Thanks to its light weight large panel units of up to approximately 25 m² can be transported, which saves a lot of time. Easy assembly of the crane lifting clamp KA in 5 steps: 1. Press safety bolt with handle in the direction of the pin to release this from the lock. 2. Turn safety bolt with handle 90° upwards. 1. 3. Pull out safety bolt until it stops. 4. Position crane lifting clamp KA...

Open the catalog to page 9
NeoR - Product Information - 10

Other accessories Existing accessory parts are compatible Platform bracket Suspending piece for props In order to set up workplaces at the formwork, the bracket is attached to the panels where the railing posts lateral protection and a support for toe board are mounted. The planks and the lateral boards are to be provided by site. The connection of suspending pieces for props to the formwork is done using suspending pieces for props via an integrated hook head connection in the oblong holes of the cross profiles. The perforated tie is installed as a lost tie anchor under the formwork panels...

Open the catalog to page 10

All PASCHAL-Werk G. Maier GmbH catalogs and technical brochures

  1. Step L/N

    2 Pages

  2. Formwork Manual

    275 Pages

  3. TTK

    2 Pages

  4. Work safety

    2 Pages

  5. PPL 12.0

    2 Pages

  6. Climbing

    2 Pages