1. Catalogs
  2. PASCHAL-Werk G. Maier GmbH
  3. Dismantling inside corner post

Dismantling inside corner post
1 /2Pages

Dismantling inside corner post

Dismantling inside corner post
1 /2Pages

Catalog excerpts

Dismantling inside corner post-1

Dismantling inside corner post PRODUCT INFORMATION

 Open the catalog to page 1
Dismantling inside corner post-2

Dismantling inside corner post Dismantling made easy The variable dismantling inside corner post greatly reduces the time required to move the inner formwork for lift shafts, stairways and structures with tight spaces. It is available for formwork systems LOGO.3, LOGO.alu, LOGO.pro, Modular/GE universal formwork and NeoR lightweight formwork. · Optimised dismantling process · Complete inner core can be moved without dismantling the formwork · Major time savings · Dismantling clearance of up to 5 cm from the concrete wall Optimised dismantling process On the upper side of the inside corner post...

 Open the catalog to page 2

All PASCHAL-Werk G. Maier GmbH catalogs and technical brochures

  1. Step L/N

    2  Pages

  2. Formwork Manual

    275  Pages

  3. TTK

    2  Pages

  4. Work safety

    2  Pages

  5. PPL 12.0

    2  Pages

  6. Climbing

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.