1. Catalogs
  2. Nordfab
  3. Quick-Fit® Sleeve with O-Ring

Quick-Fit® Sleeve with O-Ring

Quick-Fit® Sleeve with O-Ring

Product catalog summary
Overview: This document serves as a reference guide for Nordfab ducting products, specifically focusing on the Quick-Fit Sleeve system. It includes specifications, installation instructions, and ordering information.
Specifications:
  • The Quick-Fit Sleeve is designed for variable length adjustment in the QF System, accommodating spans less than 5 feet.
  • Constructed with laser-welded longitudinal seams to prevent leakage.
  • Standard sleeves come with a black nitrile O-ring, with an option for a high-temperature red silicone O-ring.
  • Available in various sizes, with diameters ranging from 3 to 24 inches.
Installation Instructions:
  1. Measure the distance to be spanned and mark the pipe for cutting, subtracting 4 inches from the total span.
  2. Place the O-ring on the cut pipe and slide the Quick-Fit Sleeve over it.
  3. Snap the QF Clamp over the O-ring and one end of the Quick-Fit Sleeve, ensuring the cut pipe is positioned in the direction of airflow.
  4. Drill an access hole and cut the pipe with a saw.
  5. Finish the connection with the Quick-Fit Sleeve.
Material Options and Ordering Information:
  • Standard and optional gauges are available for both galvanized and stainless steel materials.
  • Replacement O-rings are available, with specifications for standard and high-temperature applications.
  • Orders for higher quantities of O-rings may require a lead time of 7-10 working days.
Key Data from Tables:
  • QF Sleeve sizes range from 3 to 24 inches in diameter, with corresponding weights and dimensions provided.
  • O-ring sizes and weights are specified for each sleeve diameter.
See more

Catalog excerpts

Quick-Fit® Sleeve with O-Ring-1

NORDFAB DUCTING PRODUCT REFERENCE Quick-Fit® Sleeve with O-Ring Ordering Information • Solid welded seams prevent leakage. • Nitrile (black) O-ring included standard. • Specify Silicone (red) O-ring (high temp rating) if needed (additional cost). Replace on-site. • Used to provide variable length adjustment of QF System. Each QF pipe section is 5 ft. in length. To accommodate an existing span of less than 5', a sleeve is used to shorten. Formerly known as Adjustable Nipple. Rolled Edge (nom in.) Longitudinal seam is laser welded. Quick-Fit Sleeve Size (inches) Size (inches) O-Ring for Quick-Fit Sleeve Ordering Information • Replacement O-ring for use with Quick-Fit Sleeve. • Specify Black for standard applications. • Specify Red for high temp material. Higher quantities may require 7 - 10 working days lead time. QF Clamp attached over rolled edge and O-ring. The Quick-Fit Sleeve provides an easy way to adjust in areas where you need straight duct sections shorter than 5' Quick-Fit Sleeve Installation Instructions Measure distance to be spanned. Place O-ring on the cut pipe and slide a Quick-Fit Sleeve over the cut piece. On a Pipe, mark distance to be spanned less 4". Snap QF Clamp over O-ring and one end of Quick-Fit Sleeve. Finished connection with the Quick-Fit Sleeve Use provided O-ring to mark for cut. NOTE: POSITION CUT PIPE IN THE SAME DIRECTION AS THE AIRFLOW. Drill access hole, then cut Pipe with saw.

 Open the catalog to page 1
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.
About DirectIndustry
DirectIndustry is a marketplace that offers B2B players a complete experience, from product sourcing to purchase. DirectIndustry is an entity of VirtualExpo Group.