1. Catalogs
  2. Nordfab
  3. Quick-Fit® Sleeve with O-Ring

Quick-Fit® Sleeve with O-Ring
1 /1Page

Quick-Fit® Sleeve with O-Ring

Quick-Fit® Sleeve with O-Ring
1 /1Page

Catalog excerpts

Quick-Fit® Sleeve with O-Ring-1

NORDFAB DUCTING PRODUCT REFERENCE Quick-Fit® Sleeve with O-Ring Ordering Information • Solid welded seams prevent leakage. • Nitrile (black) O-ring included standard. • Specify Silicone (red) O-ring (high temp rating) if needed (additional cost). Replace on-site. • Used to provide variable length adjustment of QF System. Each QF pipe section is 5 ft. in length. To accommodate an existing span of less than 5', a sleeve is used to shorten. Formerly known as Adjustable Nipple. Rolled Edge (nom in.) Longitudinal seam is laser welded. Quick-Fit Sleeve Size (inches) Size (inches) O-Ring for Quick-Fit Sleeve Ordering Information • Replacement O-ring for use with Quick-Fit Sleeve. • Specify Black for standard applications. • Specify Red for high temp material. Higher quantities may require 7 - 10 working days lead time. QF Clamp attached over rolled edge and O-ring. The Quick-Fit Sleeve provides an easy way to adjust in areas where you need straight duct sections shorter than 5' Quick-Fit Sleeve Installation Instructions Measure distance to be spanned. Place O-ring on the cut pipe and slide a Quick-Fit Sleeve over the cut piece. On a Pipe, mark distance to be spanned less 4". Snap QF Clamp over O-ring and one end of Quick-Fit Sleeve. Finished connection with the Quick-Fit Sleeve Use provided O-ring to mark for cut. NOTE: POSITION CUT PIPE IN THE SAME DIRECTION AS THE AIRFLOW. Drill access hole, then cut Pipe with saw.

 Open the catalog to page 1
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.