1. Catalogs
  2. Mersen Power Transfer Technologies
  3. Carbon dust collection systems for hydro generators
video corpo

Carbon dust collection systems for hydro generators
1 /4Pages

Carbon dust collection systems for hydro generators

Carbon dust collection systems for hydro generators
1 /4Pages

Catalog excerpts

Carbon dust collection systems for hydro generators-1

BETTER HYDRO GENERATOR EFFICIENCY ■ Over 90 % of carbon brush dust is suctioned at its source, to avoid dispersion all over the machine ■ They offer higher reliability for continuous power production DESIGNED TO AVOID SHORT CIRCUITS CAUSED BY LOW INSULATION RESISTANCE INCREASED HYDRO GENERATOR RUNNING TIME ■ There is less cleaning maintenance A SMART CONCEPT S Minimal maintenance S Completely integrated and customized with plug & play concept S Designed for new, retrofit and refurbished hydro generators (up to 900 MW) MERSEN PROPERTY

 Open the catalog to page 1
Carbon dust collection systems for hydro generators-2

MERSEN DUSTCOLLECTOR A RELIABLE SOLUTION  Studies by Mersen’s design offices  High quality materials  Conformity to international standards (HEPA, CE, UL, CSA) If oil vapor is present, it will seriously affect the DustCollector’s performance. MDC OPERATING BLOCK DIAGRAM Manifolds Brush-holders equipped with patented special design collection shoe Dedicated flexible vacuum tubing with adapted diameters Vacuum station MERSEN’S DUSTCOLLECTOR OFFERS CONSIDERABLE BENEFITS:  Accurate air suction calculation to collect carbon dust without causing a depression inside the hydro generator  No effect...

 Open the catalog to page 2
Carbon dust collection systems for hydro generators-3

DUST SUCTION SHOE Dust suction shoe INDUSTRIAL VACUUM UNIT Duty cycle

 Open the catalog to page 3
Carbon dust collection systems for hydro generators-4

MERSEN DUSTCOLLECTOR MAIN BENEFITS FOR THE USERS SAFETY AND HEALTH FOR THE OPERATORS  Over 90 % of carbon dust is suctioned at its source, to avoid dispersion all over the machine and inhalation by the operators VERY QUICK RETURN ON INVESTMENT  Less than 18 months STRONG REDUCTION OF THE NUMBER OF FLASH-OVER OCCURENCES  Cost savings on repairs  Maximized performance MAINTENANCE COST REDUCTION  Preventive maintenance  No need to perform coil cleaning by dry ice blasting BETTER RELIABILITY TO MAXIMIZE THE BENEFIT FOR ELECTRICAL PRODUCTION Australia, Austria, Canada, Chile, Colombia, Finland,...

 Open the catalog to page 4

All Mersen Power Transfer Technologies catalogs and technical brochures

  1. CG677

    2  Pages

  2. BOOSTEC® SiC

    9  Pages

  3. PRODUCT CATALOG

    348  Pages

  4. Ski lifts

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.