Catalog excerpts
Technical data Hydraulic crawler crane
Open the catalog to page 1Dimensions Basic machine with undercarriage Operating weight The operating weight includes the basic machine with telescopic undercarriage, 2 main winches 100 kN each, including wire ropes (1x 90 m / 1x 70 m) and 10 m main boom, consisting of boom foot (6.0 m), boom head (3.5 m) and hinged section (0.5 m), 5.9 t basic counterweight, 600 mm 3-web grousers and 30 t hook block. 1. The lifting capacities stated are valid for lifting operation only (corresponding with crane classication according to F.E.M. 1.001, crane group A1). Total weight 2. Crane standing on rm, horizontal ground. 3. The...
Open the catalog to page 2Transport dimensions and weights Basic machine and boom (No. 0808.xx) Transport - with 10 m main boom includes the basic machine (ready for operation) with boom foot (6 m), boom head (3.5 m), hinged section (0.5 m), hook block (30 t) and counterweight (5.9 t). Weight complete with counterweight Transport - with 16 m main boom includes the basic machine (ready for operation) with boom foot (6 m), boom head (3.5 m), hinged section (0.5 m), 2x boom section (3 m), hook block (30 t) and counterweight (5.9 t). Weight complete with counterweight Transport - with 22 m main boom includes the basic...
Open the catalog to page 3Transport dimensions and weights Boom section Boom section Width Weight Hooks 30 t hook block – 1 sheave 700 Width Weight 10 t single hook Width Weight
Open the catalog to page 4Main winches Power rating according to ISO 9249, 180 kW (241 hp) at 2000 rpm Engine type Liebherr D 934 A7 SCR Fuel tank 470 l capacity with continuous level indicator and reserve warning Engine complies with NRMM exhaust certication EPA/CARB Tier 4i or 97/68 EC Stage III B. ECO-Silent-Mode: For work not requiring high engine power, the diesel engine can be operated in the ECO-Silent-Mode (e.g. for inserting reinforcement cages or for lift crane operation). Due to the ECO-Silent-Mode which can be preselected by the operator the engine runs with optimum fuel efciency. This lowers consumption...
Open the catalog to page 5(Main boom No. 0808.xx and 5.9 t counterweight) Slurry wall grab and clamshell Slurry wall grab Winch options Line speed 1st layer Max. chisel weight Winch options Line speed 1st layer
Open the catalog to page 6(Main boom No. 0808.xx and 5.9 t counterweight) Casing oscillator Casing oscillator Winch options Line speed 1st layer Max. drilling diameter
Open the catalog to page 7Load chart for duty cycle operation (Main boom No. 0808.xx) 5.9 t counterweight Capacities in metric tonnes for boom lengths (10 m - 22 m) - with 100 kN winches Boom length (m) Radius Above load chart is for reference only. For actual lift duty please refer to load chart in operator’s cab or manual. Maximum capacity in duty cycle operation with standard ropes Line pull Rope diameter Minimum breaking load Line pull - 1-rope duty cycle operation Line pull - 2-rope duty cycle operation 1) 1) Lifting a load exceeding the line pull of one winch is only allowed if it can be ensured that each...
Open the catalog to page 8Clamshell equipment Capacities in metric tonnes for boom lengths (10 m - 22 m) Working diagram Max. capacities in metric tonnes do not exceed 66.7% of tipping load. Capacities in duty cycle operation are for reference only and are not programmed in the LMI system. C = Radius / dumping radius J = Height of boom head sheave centre above ground level K = Length of clamshell (according to manufacturer‘s specication)
Open the catalog to page 9Main boom Main boom conguration (No. 0808.xx) Conguration for boom lengths (10 m - 22 m) Amount of boom extensions Length Boom foot Hinged section Boom section Boom head
Open the catalog to page 10Load chart for lift crane operation (Main boom No. 0808.xx) 5.9 t counterweight Capacities in metric tonnes for boom lengths (10 m - 22 m) - with 100 kN winches Boom length (m) Radius Above load chart is for reference only. For actual lift duty please refer to load chart in operator’s cab or manual.
Open the catalog to page 11HS 8030 HD—11223967—05/2014 Subject to change without notice. Liebherr-Werk Nenzing GmbH Dr. Hans Liebherr Str. 1, 6710 Nenzing/Austria Tel.: +43 50809 41–473, Fax: +43 50809 41–499 crawler.crane@liebherr.com, www.liebherr.com facebook.com/LiebherrConstruction
Open the catalog to page 12All Liebherr Excavators catalogs and technical brochures
-
T 284
28 Pages
-
Common Rail Injector LI3
2 Pages
-
Common Rail Injector LI2
2 Pages
-
Common Rail Injector LI1
2 Pages
-
Mining Industry
8 Pages
-
Diesel Engines
4 Pages
-
Combustion Engines
32 Pages
-
Electric Travel Drive Systems
14 Pages
-
Winch Systems
8 Pages
-
Advanced Tunnel Technology
12 Pages
-
Troubleshoot Advisor
12 Pages
-
A 920
28 Pages
-
A 916
44 Pages
-
A 914
38 Pages
-
PR 736 - PR 756 Litronic
32 Pages
-
PR 726 Litronic
22 Pages
-
Timber Handling
36 Pages
-
Job Report PR 726 LGP
2 Pages
-
PR 716 Litronic
20 Pages
-
LR 626 Litronic
10 Pages
-
LRS 645 LH
4 Pages
-
LRS 645
8 Pages
-
LRS 545 Toplift
4 Pages
-
LRS 545 Intermodal
4 Pages
-
R 914COMPACT
24 Pages
-
A 918
42 Pages
-
LR 626
10 Pages
-
R 920
28 Pages
-
A 924 Heavy Lift
12 Pages
-
Product Brochure TA 230
16 Pages
-
Technical Description A 918
28 Pages
-
914 Compact
24 Pages
-
Product Brochure A 912 Compact
20 Pages
-
Product Brochure A 910 Compact
18 Pages
-
Liebherr RL-K Series
2 Pages
-
Liebherr Ship Cranes Overview
20 Pages
-
LR 614 – LR 634
12 Pages
-
crawler tractor PR 726 Litronic
10 Pages
-
Mining Truck
24 Pages
-
The hydraulic excavators
12 Pages
-
The Liebherr Working Tools
44 Pages
-
Litronic-FMS II
4 Pages
-
Mobile crane LTM 1030-2.1
16 Pages