
Industrial Applications
Open the catalog to page 1Technical Data Engine Rating per SAE J1349 188 HP (140 kW) at 1,700 rpm Rating per ISO 9249 190 HP (140 kW) at 1,700 rpm Model Liebherr D934 according to stage IIIB / Tier 4i Type 4 cylinder in-line Bore/Stroke 4.8/5.9 in Displacement 427.1 in3 Engine operation 4-stroke diesel Common-Rail turbo-charged and after-cooled reduced emissions Harmful emissions values in accordance with EPA/CARB-40CFR stage Tier 4 interim Emission control Liebherr particle filter Cooling water-cooled with integrated motor oil cooler Air cleaner dry-type air cleaner with pre-cleaner, primary and safety elements Fuel...
Open the catalog to page 2Choice of Cab Elevation Cab Elevation LFC (Rigid Elevation) Cab Elevation LHC (Hydraulic Elevation) D2 D1 Increase Type A rigid cab elevation has a fixed eye level height. For a lower transport height, the shell of the cab can be removed and replaced by a transport device. The dimension C is in this machine design for all rigid cab elevations 12’10”. Increase Type LHC 255 LHC 340-35 B1 10’ 1” 11’ 5” B2 18’ 5” 22’ 7” C1 11’10”13’ C2 20’ 2” 24’ 2” D1 4’ 6” 8’ D2 4’11”8’ E 11’ 8”12’11” The hydraulically adjustable cab allows the driver, that he can choose his field of view freely and at...
Open the catalog to page 3Operating Weight The operating weight includes basic machine with 4 point outriggers, hydr. cab elevation, 4 solid tires, industrial-type straight mono boom 24’11” and industrial-type angled stick 16’5”. with grapple model GM 70C/1.44 yd3 semi-closed tines ft Undercarriage Stabilizers raised 55 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers...
Open the catalog to page 4Operating Weight The operating weight includes basic machine with 4 point outriggers, hydr. cab elevation, 4 solid tires, industrial-type straight mono boom 28’3” and industrial-type angled stick 19’8”. with grapple model GM 70C/1.44 yd3 semi-closed tines ft Undercarriage Stabilizers raised 55 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers...
Open the catalog to page 5The operating weight includes basic machine with 4 point outriggers, hydr. cab elevation, 4 solid tires, industrial-type straight mono boom 28’3” and industrial-type stick with tipping kinematics 19’8”. with sorting grab SG 30/1.31 yd3 tines Operating Weight ft Undercarriage Stabilizers raised 55 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers...
Open the catalog to page 6Operating Weight The operating weight includes basic machine with 4 point outriggers, hydr. cab elevation, 4 solid tires, industrial-type angled mono boom 28’3” and industrial-type flat angled stick 24’7”. with clamshell model GM 20B/1.96 yd3 shells for loose material ft Undercarriage Stabilizers raised 55 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt....
Open the catalog to page 7Operating Weight The operating weight includes basic machine with 4 point outriggers, hydr. cab elevation, 4 solid tires, industrial-type angled mono boom 28’3” and industrial-type flat angled stick 24’7”. with clamshell model GM 20B/1.96 yd3 shells for loose material ft Undercarriage Stabilizers raised 55 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt....
Open the catalog to page 8Operating Weight The operating weight includes basic machine with 4 point outriggers, hydr. cab elevation, 4 solid tires, industrial-type angled mono boom 31’6” and industrial-type flat angled stick 24’7”. with clamshell model GM 20B/1.96 yd3 shells for loose material Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers...
Open the catalog to page 9(Kinematic 2C) Operating Weight The operating weight includes basic machine with 4 point outriggers, hydr. cab elevation, 4 solid tires, industrial-type angled mono boom 31’6” and industrial-type flat angled stick 24’7”. with clamshell model GM 20B/1.96 yd3 shells for loose material ft Undercarriage ft in Stabilizers raised 9,6* 9,6* 33’ 7” 50 4 pt. outriggers down 9,6* 9,6* Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised...
Open the catalog to page 10The operating weight includes basic machine with 4 point outriggers, hydr. cab elevation, 4 solid tires, industrial-type straight mono boom 29’10” and industrial-type angled stick 22’4”. with grapple model GM 70C/1.44 yd3 semi-closed tines Operating Weight Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised 4 pt. outriggers down Stabilizers raised...
Open the catalog to page 1120 Pages
32 Pages
24 Pages
24 Pages
52 Pages
20 Pages
2 Pages
12 Pages
12 Pages
16 Pages
16 Pages
40 Pages
20 Pages
32 Pages
32 Pages
64 Pages
56 Pages
4 Pages
72 Pages
4 Pages
2 Pages
4 Pages
24 Pages
20 Pages
42 Pages
19 Pages
36 Pages
4 Pages
6 Pages
2 Pages
1 Page
7 Pages
13 Pages
4 Pages
16 Pages
24 Pages
21 Pages