Maximizing Cost and Time Savings: The ILM Impact on Signify's Tunnel Project
6Pages

{{requestButtons}}

Catalog excerpts

Maximizing Cost and Time Savings: The ILM Impact on Signify's Tunnel Project - 1

IMAGE LUMINANCE METER

Open the catalog to page 1
Maximizing Cost and Time Savings: The ILM Impact on Signify's Tunnel Project - 2

SAVING 70% PWR CON Compared to sodium lamps Smart Tunnel Lighting Signify and LIDlight collaborate in assisting the Taipei City Government with a project to retro t 15 tunnels with intelligent LED lighting systems. Following the CIE Tunnel Lighting Standard (CIE88), LIDlight incorporates the ILM luminance meter to create a smart system. This system adjusts tunnel illuminance based on external daylight, reducing driver adaptation time and enhancing safety. Compared to traditional sodium lamps, the LED tunnel lighting achieves over 50% reduction in power consumption, with actual energy usage...

Open the catalog to page 2
Maximizing Cost and Time Savings: The ILM Impact on Signify's Tunnel Project - 3

Accurate L20 Values LIDlight INC. Following the guidelines of CIE88 standard, the installation of luminance be required due to practical considerations such as engineering constraints or Compared to luminance meter luminance values. Consequently, the tunnel lighting system operates at a meters at the speci ed SSD position is necessary. However, adjustments may environmental factors. The ILMA software, coupled with LIDlight's ILM equipment, offers customizable analysis for dynamic applications. This customization enables the exclusion of unnecessary zones, resulting in more accurate L20...

Open the catalog to page 3
Maximizing Cost and Time Savings: The ILM Impact on Signify's Tunnel Project - 4

SAVING 70% PWR CON Compared to sodium lamps Smart Tunnel Lighting Signify and LIDlight collaborate in assisting the Taipei City Government with a project to retro t 15 tunnels with intelligent LED lighting systems. Following the CIE Tunnel Lighting Standard (CIE88), LIDlight incorporates the ILM luminance meter to create a smart system. This system adjusts tunnel illuminance based on external daylight, reducing driver adaptation time and enhancing safety. Compared to traditional sodium lamps, the LED tunnel lighting achieves over 50% reduction in power consumption, with actual energy usage...

Open the catalog to page 4
Maximizing Cost and Time Savings: The ILM Impact on Signify's Tunnel Project - 5

SAVING 10% COST LIDlight INC. *The data presented is derived from actual projects in Taipei, Taiwan provided by Signify Taiwan. The traditional luminance meter requires an ILM (Image-based Luminance Meter)'s unique installation distance based on the urban speed varied focal lens feature, installation positions limit SSD design, often necessitating additional become more flexible. It can be mounted on pole construction. (For instance, at a 60 km/hr speed existing structures such as lamp posts, adjusting limit, the traditional luminance meter requires a 60- the field of view (FOV) to meet the...

Open the catalog to page 5
Maximizing Cost and Time Savings: The ILM Impact on Signify's Tunnel Project - 6

Stage 7 Stage 6 Stage 5 Stage 4 Stage 3 Stage 2 Stage 1 Each tunnel will be divided into 2-3 selections based on the actual length and visual adaptability.