中国认可 国际互认 检测 TESTING CNAS L0446 Electromagnetic compatibility TEST REPORT Total Sample Description : Waterproof Scissor Switch Keyboard K-TEK-V285-FN-BL-FC-SC-NV-151B-DW P+TP65-DML+2K V285-FN-BL-FC-SC-NV-151B-DWP+TP65-DML+2K: 20251011000004 : Key Technology Rugged System Ltd Manufacturer : Key Technology Rugged System Ltd Test Type : Commissioning Test
Open the catalog to page 1GRG Metrology & Test Group Co.,Ltd. Address: China guangzhou tianhe huangpu avenue xiping cloud road no. 163 Telephone: +86-020-38699959 Facsimile: +86-020-38698685 http://www.grgtest.com
Open the catalog to page 2GRG Metrology & Test Group Co.,Ltd Address: No.8, Chuangyun Road, Panyu District, Guangzhou, Guangdong, China. Telephone: +86-020-38699959 Facsimile: +86-020-38698685 http://www.grgtest.com
Open the catalog to page 3GRG Metrology & Test Group Co.,Ltd Address: No.8, Chuangyun Road, Panyu District, Guangzhou, Guangdong, China. Teleohone: +86-020-38699959 Facsimile: +86-020-38698685 httD://www.eretest.com
Open the catalog to page 41. This station carries out test task according to the national regulation of verifications which can be traced to National Primary Standards and BIPM. 2. The test report merely corresponds to the test sample. It is not permitted to copy extracts of these test result without the written permission of the test laboratory. 3. If there is any objection concerning the test, the client should inform the laboratory within 15 days from the date of receiving the test report. GRG Metrology & Test Group Co.,Ltd Address: No.8, Chuangyun Road, Panyu District, Guangzhou, Guangdong, China. Telephone: +86-020-38699959...
Open the catalog to page 53.8 CS116, conducted susceptibility, damped sinusoidal transients, cables and power GRG Metrology & Test Group Co.,Ltd Address: No.8, Chuangyun Road, Panyu District, Guangzhou, Guangdong, China. Telephone: +86-020-38699959 Facsimile: +86-020-38698685 http://www.grgtest.com
Open the catalog to page 6GRG Metrology & Test Group Co.,Ltd Address: No.8, Chuangyun Road, Panyu District, Guangzhou, Guangdong, China. Telephone: +86-020-38699959 Facsimile: +86-020-38698685 http://www.grgtest.com
Open the catalog to page 72. EUT and Auxiliary Equipment Connection Diagram. 3. Power Supply:Working State 2:DC 5V, Working State 1:EUT is powered by instruments 4. Test Mode NO. Working State Description ofWorking State The test computer was powered and the communication was normal. After powering on, the test specimen DC5V establishes normal communication with the test computer. Remark The client has designated the following test items: CS112、RE101、RE102、 RS101、RS103. The client has designated the following test items: CE101、CE102、CS101、 CS106、CS114、CS115、CS116. 5. Monitoring Method for Immunity Tests Target Monitoring...
Open the catalog to page 83 Test project situation and results3.1 CE101, conducted emissions,power leads,25Hz to 10kHz EUT name Test Position Power Supply Test requirements/limits: Table CE102-1 Limit Value Main test equipment: GRG Metrology & Test Group Co.,Ltd Address: No.8, Chuangyun Road, Panyu District, Guangzhou, Guangdong, China. Telephone: +86-020-38699959 Facsimile: +86-020-38698685 http://www.grgtest.com
Open the catalog to page 9Anechoic Chamber Test software: Test system test results meet the standard requirements: Pass Test position: Positive power cab^ Negative power cable. Test configuration Test Procedure: a> The test equipment is powered on for preheating and reaches a stable operating state; K Perform the verification by applying 1kHz, 3kHz, and 10kHz verification signals to the current probe, with the signal level being 6dB below the standard limit value; c> Measure the current level using an oscilloscope and a resistor, while checking if the current GRG Metrology & Test Group Co.,Ltd Address: No.8, Chuangyun...
Open the catalog to page 10waveform is a sine wave; d^ The measurement receiver scans in the normal data scanning mode, confirming that the measurement value of the measurement receiver is within the ±3dB range of the oscilloscope current measurement value. If the measurement value deviates by more than ±3dB, the error cause must be identified and corrected. e> Configure the test according to Figure CE101-2; f The test sample is powered on for preheating to achieve a stable operating condition; g^ Select a power cord and clip the current probe onto the power line to be tested; h Using the bandwidth and minimum measurement...
Open the catalog to page 11Note: Result = Reading + Correct factor, Margin = Limit - Result GRG Metrology & Test Group Co.,Ltd Address: No.8, Chuangyun Road, Panyu District, Guangzhou, Guangdong, China. Telephone: +86-020-38699959 Facsimile: +86-020-38698685 http://www.grgtest.com
Open the catalog to page 12Note: Result = Reading + Correct factor, Margin = Limit - Result GRG Metrology & Test Group Co.,Ltd Address: No.8, Chuangyun Road, Panyu District, Guangzhou, Guangdong, China. Telephone: +86-020-38699959 Facsimile: +86-020-38698685 http://www.grgtest.com
Open the catalog to page 133.2 CE102, conducted emissions,power leads,10kHz to 10MHz EUT name Test Position Power Supply Test requirements/limits: Table CE102-1 Limit Value GRG Metrology & Test Group Co.,Ltd Address: No.8, Chuangyun Road, Panyu District, Guangzhou, Guangdong, China. Telephone: +86-020-38699959 Facsimile: +86-020-38698685 http://www.grgtest.com
Open the catalog to page 14Anechoic Chamber Test software: Test system test results meet the standard requirements: Pass Test Position: Positive power cablex Negative power cable. Test configuration: Test Procedure: a> Turn on the measurement equipment and allow a sufficient time for stabilization. bx Apply a signal level that is at least 6 dB below the limit at 10 kHz, 100 kHz, 2MHz and 10 MHz to the power output terminal of the LISN. At 10 kHz and 100kHz, use an oscilloscope to calibrate the signal level and verify that it is sinusoidal. cx Scan the measurement receiver for each frequency in the same manner as a normal...
Open the catalog to page 15Verify that the measurement receiver indicates a level within. d^ Repeat b through c for each LISN. e> Maintain a basic test setup for the EUT as shown and described in Figures CE102-2. f Turn on the EUT and allow a sufficient time for stabilization. g^ Select an appropriate lead for testing. h Scan the measurement receiver over the applicable frequency range, using the bandwidths and minimum measurement times on the standard,Record the test spectrum curve to judge whether it is beyond the prescribed limit. k Repeat g to h for each power lead,finishing the test. The sample works normally and...
Open the catalog to page 168 Pages
17 Pages
3 Pages
2 Pages
3 Pages
3 Pages
1 Page
3 Pages
3 Pages
2 Pages
3 Pages
1 Page
3 Pages
3 Pages
3 Pages
3 Pages
2 Pages
3 Pages
3 Pages
3 Pages
3 Pages
2 Pages
3 Pages
2 Pages
3 Pages
3 Pages
3 Pages
3 Pages
2 Pages
3 Pages
3 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
16 Pages
4 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
4 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
4 Pages
3 Pages
2 Pages
2 Pages
3 Pages
3 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
3 Pages
3 Pages
3 Pages
3 Pages
4 Pages
3 Pages
3 Pages
3 Pages
3 Pages
2 Pages
3 Pages
3 Pages
2 Pages
3 Pages
3 Pages
2 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
2 Pages
2 Pages
2 Pages
2 Pages
3 Pages
3 Pages
2 Pages
3 Pages
3 Pages
2 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
3 Pages
21 Pages
55 Pages
2 Pages
2 Pages
2 Pages
3 Pages