Ruiyi CEMS in Power Plant Application
5Pages

{{requestButtons}}

Catalog excerpts

Ruiyi CEMS in Power Plant Application - 1

iiWkiaSgjSSStWKfiS) Hubei Cubic-Ruiyi Instrument Co.,Ltd. 1. Project Introduction The end user of this project is a power plant that undertaken a 60MW power generation project for Chinese company. The main raw material is coal. CEMS is required to monitor the parameters such as SO2, NOX, CO, CO2, O2, flow, pressure, temperature and dust. Compared with other manufacturers, our standard CEMS solution with high cost-effective is able to meet all requirements, at the same time we can provide good installation service. Installation Time: 2018.10.15-2018.10.22 Mounting Point: Indonesia 2. Installation "Customer First, Service First", this is Cubic-Ruiyi eternal purpose, so our engineer go to Indonesia to provide installation guidance for customers, assist customers in the installation problems, and carry out system training. This project is a standard CEMS application, in which installation point is 45 meters away from the ground. It is mainly used for real-time monitoring of NOX and SO2, to understand the efficiency of desulfurization and denitrification equipment, make sure pollutant emissions to meet local requirements, achieve environmental protection and reduce cost of equipment operation.

Open the catalog to page 1
Ruiyi CEMS in Power Plant Application - 2

iiWkiaSgjSSStWKfiS) Hubei Cubic-Ruiyi Instrument Co.,Ltd. 4. Installation Issues 1) TPF Detector Issues Describe: Bending of the differential pressure tube leads to poor ventilation, it affects the accuracy of pipeline pressure detection in the chimney. Solution: The bending phenomenon of the equipment is the structural defect of the field frequency design (caused by insufficient space). Our engineer adopts the 8mm PTFE tube to heat the shape to a 90 degree angle, then dock with the original air tube, and sealed with insulating tape to ensure that pipeline is unobstructed. 2. Water in...

Open the catalog to page 2
Ruiyi CEMS in Power Plant Application - 3

Sampling Probe Installation Detector of TPF and Dust Installation

Open the catalog to page 3
Ruiyi CEMS in Power Plant Application - 4

System Installation Training Service

Open the catalog to page 4
Ruiyi CEMS in Power Plant Application - 5

iiWkiaSgjSSStWKfiS) Hubei Cubic-Ruiyi Instrument Co.,Ltd. The Indonesia customer is very satisfied with Cubic-Ruiyi 's system solution and service, they want to place other new orders for two units system next year, and they are willing to establish a long-term cooperative relationship with our company.

Open the catalog to page 5