Project Overview: The document details the mechanized tunneling project for the restructuring of the Emscher River in Germany, focusing on the launch shaft for pipe jacking the Emscher canal system in Dortmund. The project is part of a larger initiative to restore the Emscher River, which had been polluted for over a century.
Key Specifications:
  • Location: Dortmund, Germany
  • Customer: Consortium Icotekne S.p.A. - Implenia AG
  • Contractor: Emschergenossenschaft / Lippeverband
  • Machine Used: V-006, VSM9000
  • Shaft Depth: 23 meters
  • Diameter: 9,000 mm
  • Geology: Sand, silt, clay
Technological Innovations: The project utilized Herrenknecht's VSM9000 technology, marking its premiere in Germany. This technology allows for simultaneous shaft sinking and lining, significantly reducing construction time and environmental impact.
Project Execution: The construction of the 23-meter deep starting shaft began in April 2008 and was completed in 17 working days. The VSM9000 machine demonstrated its efficiency by minimizing noise pollution and expediting the construction process.
Future Developments: The Emscher underground tunnel, a 70-kilometer sewage channel, is central to the project. Micro-tunneling machines will be used for further tunneling work. The completion of the "New Emscher Valley" is anticipated between 2020 and 2027.
Company Profile: Herrenknecht AG is a leader in mechanized tunneling technology, providing high-tech machinery for various ground conditions and diameters worldwide.
See more

Catalog excerpts

MECHANIZED TUNNELING SUPPORTS -1

herrenknecht AG | ut i l i ty tunne l l ing | Traf f ic tunne l l ing GER MANY GER MANY : MECH ANI ZED TUNELIN G SUPPORT S RE STRUCTURIN G OF THE EMSCHER . Project: Launch shaft for Pipe Jacking the Emscher canal system Location: Dortmund, Germany Background: New sewage tunnel for the Emscher River Customer: Consortium Icotekne S.p.A. - Implenia AG Contractor: Emschergenossenschaft / Lippeverband Machine: V-006, VSM9000 Shaft construction: Shaft Lining Shaft depth: 23m Pioneering technology: Segmental Lining with integrated corrosion protection

 Open the catalog to page 1
MECHANIZED TUNNELING SUPPORTS -2

04.2010 Herrenknecht AG D-77963 Schwanau Phone + 49 (7824) 302-0 Fax + 49 (7824) 302-364 [email protected] www.herrenknecht.com Installing the VSM9000 at the construction site. Shaft sinking and shaft lining carried out simultaneously. 23-meter deep shaft was sunk in 17 working days. NE W SEWAGE TUNNEL FOR THE EMSCHER RI VER . Thanks to the “Emscher restructuring” concept, the Emscher river once again has its blue splendor. The project got underway in the 90s, after the river had been contaminated by sewage and mine water for a good 100 years. It covered the entire course of the river,...