Y Strainers

Y Strainers

Y Strainers

Product catalog summary
Introduction
This document provides installation, operation, and maintenance instructions for Hayward Y-Strainers. It emphasizes the importance of following these guidelines to prevent injury and ensure proper product performance.

Product Guarantee and Responsibility
Hayward guarantees its products against defects in material and workmanship but does not assume responsibility for damages or injuries due to improper installation, misuse, or chemical incompatibility. Users should verify compatibility and suitability for their specific applications.

Operating Conditions
Before installation, consult Hayward literature for pressure and temperature limitations. The maximum fluid velocity is eight feet per second to avoid damage from water hammer effects. Hayward products are designed for non-compressible liquids and should not be used with compressible fluids.

Installation Considerations
Systems must be depressurized and drained before installation or maintenance. Consider temperature effects on piping systems to prevent mechanical loading on equipment. Avoid direct installation of metal pipes into plastic connections; use at least 10 pipe diameters of plastic pipe upstream and downstream of plastic valves.

Socket Connection
Socket connections should follow ASTM specifications. Proper cleaning, priming, and cementing techniques are essential to ensure leak-free joints. Full set and cure times vary based on temperature and pipe size.

Threaded Connection
Threaded connections require Teflon tape for sealing. Pipes should be hand-tightened and then further tightened with a strap wrench to avoid excessive stress.

Flanged Connection
Flange bolts should be tightened to compress the gasket without distorting the flanges. Use a cross-sequence tightening method and well-lubricated bolts and nuts.

Installation Recommendations
Install strainers at least 10 pipe diameters from pumps and 5 diameters from elbows. Maintain a maximum fluid velocity of 8 feet per second.

Screen Cleaning
Depressurize and drain the system before cleaning the strainer screen. Clean the screen when the pressure drop exceeds 5 PSI. Avoid deforming the screen during cleaning and use non-petroleum lubricants for reassembly.

Conclusion
Following these guidelines ensures the safe and efficient operation of Hayward Y-Strainers. Regular maintenance and adherence to installation procedures are crucial for optimal performance.
See more

Catalog excerpts

Y Strainers-2

FLANGED CONNECTION: Flange bolts should be tight enough to slightly compress the gasket and make a good seal, without distorting or putting excessive stress on the flanges. Suitable washers should be used between the bolt head and flange and the nut and flange. Bolts should be tightened in alternating sequence. > RECOMMENDED FLANGE BOLT TORQUE. USE WELL LUBRICATED METAL BOLTS AND NUTS. USE SOFT RUBBER GASKETS. FLANGE BOLT TORQUE FLANGE BOLT TORQUE SIZE DIA. FT. LBS. SIZE DIA. FT. LBS. 1/2 1/2 10-15 2 5/8 15-25 3/4 1./2 10-15 2-1/2 5/8 20-25 1 1/2 10-15 3 5/8 20-25 1-1/4 1/2 10-15 4 5/8 20-25...

 Open the catalog to page 2

All Hayward Industries, Inc. catalogs and technical brochures

  1. QIC Valves

    2  Pages

  2. Gauge Guards

    2  Pages

  3. Relief Valves

    2  Pages

  4. Angle Valves

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.