Folding machines
2Pages

{{requestButtons}}

Catalog excerpts

Folding machines - 1

A : ~ 5 10 mm above guide element upper edge of ball cage.Clearance between ionizing bar and sheet at C: ~ 30 mm above sheet. Turn the ionizing bar in the holders until the ionizing needles are at right angles to the sheet. Seat the angled plug of the HV-cable in the socket of the ionizing bar and hand-tighten the securing screws. Installation on a shaft at the exit of a folding pocket Installing ionizing bars at positions A and C At these points folding machines have shafts (֘ 20 mm), tie bars 20 x 20 mm or tie-angles (of the sheet guide elements) crosswise to the direction of sheed feed. Mount bar holders 10.0268.000 or Klick-Zack holders 10.0004.000 on the chrome-plated caps of the ionizing bars. Mount holders 10.0268.000 on shaft ( 20 mm), and holders 10.0014.000 on tie-bar (20 x 20 mm) or tie-angle. Spacing corresponding to bar length or the length of the holders secured to the end caps. Connection by means of braces X-0404 (large), X-0267 (small) or slotted plate X-0422.Clearance between ionizing bar and sheet at > The HAUG ionizing package for folding machines is designed to eliminate electrostatic charges from the sheets to be folded. The package consists of a power supply unit, ionizing bars, high-voltage cables and holders. Installing the ionizing bars A standard ionizing package for folding machines has three ionizing bars for the following standard positions A in front of the sheet feeder to the first folding pocket or in the front of the feed to the folding unit bar holder10.0268.000shaft with 20 mmIonizing barEI VS slotted plate X-0422 Installing the power supply unit The power supply unit can be installed anywhere and in any position. Connect the power supply unit as described in the installation instructions. The power supply unit has an input cable for connection to a grounded mains socket by means of a standard plug. It can be positioned beneath the folding unit at the appropriate folding-machine station. Always comply with the enclosed operating instructions. B on the folding pocket C the third ionizing bar can be installed at a variety of positions:at the exit from the folding unit or above the shaft of the roller table, in front of the feed to the next folding station, or above the exit to the delivery.The most sastisfactory results are obtained with two ionizing bars, one installed at postion A and one at position B . Installation of a tie-bar bar holder10.0268.000 ionizing barEI VS angle braceX-0267fixing bloc10.0014.000 tie-bar20 x 20 mm > Electrostatic charges in folding machines size="-1">

Open the catalog to page 1
Folding machines - 2

tr.row {} td.cell {} div.block {} div.paragraph {} .font0 { font:4.00pt "Arial", sans-serif; } .font1 { font:5.00pt "Arial", sans-serif; } .font2 { font:7.00pt "Arial", sans-serif; } .font3 { font:7.00pt "Arial Black", sans-serif; } .font4 { font:13.00pt "Arial Black", sans-serif; } .font5 { font:7.00pt "Times New Roman", serif; } Installation at position B Clamp clip-on holders 10.0268.000 to the guiding lments of the folding pocket at a distance corresponding to the length of the ionizing bars. Position directly behind the point where the sheets exits the folding unit. The distance...

Open the catalog to page 2

All HAUG catalogs and technical brochures

  1. Clean room

    2 Pages

  2. Tampon print

    2 Pages

  3. Bar holder

    2 Pages