K2i-1250
1 /2Pages

K2i-1250

K2i-1250
1 /2Pages

Catalog excerpts

K2i-1250-1

From the stack to the 3-ton truss „We developed tremendously over the years – and along with us our production plants “, says Bodo Mierisch who has been co-managing Opitz Holzbau together with Martin Opitz since 2003. How far this development has progressed in the meantime becomes evident during an on-site visit. B  Kathrin Lanz   P  Kathrin Lanz, Opitz Holzbau (1)

 Open the catalog to page 1
K2i-1250-2

Holzbau 1 In Berlin-Kreuzberg, eleven large-volume high-rise buildings with six or seven stories each were expanded by a stacked story made from a wood panel construction. The order total of this timber building contract was a seven-digit euro figure. Just a few kilometers away in Neuruppin/DE, a five-story timber hybrid building that satisfies highest architectural standards was completed only recently. Starting in 2018, a new five-story residential building complete with a CLT staircase will be built in Cologne – a construction project unparalleled in the rest of Germany. Three construction...

 Open the catalog to page 2

All Hans Hundegger catalogs and technical brochures

  1. Tool catalogue

    21  Pages

  2. PBA

    1  Page

  3. PBA-3

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.