Delivery and Installation: Guyson blast systems are delivered on curtain-sided vehicles and require unloading with a forklift. Items are shrink-wrapped and strapped to pallets, with tall items possibly laid on their side. No special foundations are needed, just a clean, dry, and level floor. Qualified personnel must handle electrical connections, complying with BS7671 standards.
Electrical and Compressed Air Requirements: The document outlines the electrical and compressed air supplies needed for manual blast cabinets. Dust collectors and cyclones have specific phase, voltage, cycle, power, and current requirements. For example, the C400 Dust Collector requires a 230V single-phase supply with a 0.75 kW power rating. Compressed air must be clean, dry, oil-free, and supplied at 40-50 psi with a minimum flow rate of 2 cfm.
Cabinet Lighting: The Euroblast range requires a single-phase 230V, 50 Hz supply for external LED lighting, while the Formula range needs the same for internal bulkhead lighting with a 7.5 W LED light and a 2 amp fuse rating.
Main Supply to Blast Cabinet: The compressed air supply must be sufficient for efficient operation, with a minimum bore of 1" for standard equipment and 1 ½" for Multiblast equipment. Supply pressure should not exceed 90 psi for systems using G27 or G55 pressure pots.
Airflow Requirements: The document provides detailed airflow requirements for various air jet and nozzle options, measured in cubic feet per minute (m3/h) at different pressures. For instance, a 2.0 mm air jet at 80 psi requires 12.7 m3/h, while a 9.5 mm nozzle at 100 psi requires 340 m3/h.
See more

Catalog excerpts

Blast Machine Services-1

SERVICES REQUIRED - MANUAL BLAST CABINETS / GUYSON / GUYSON MANUAL BLAST SYSTEMS All Guyson blast systems are generally delivered on curtain sided vehicles and will require unloading using a fork lift truck. If special arrangements have already been made regarding delivery, these will be detailed on the order acknowledgement. All items will be shrink wrapped and strapped on to wooden pallets. Tall or top heavy items may be laid down on their side for transit. If you require further details regarding the packaging sizes or weights of your consignment, please contact Customer Service. No special foundations are required for this equipment. All that is required is a clean, dry and level floor. Please note that during maintenance and unloading, dust may escape from the blast system, so when consideration is given to siting, bear this in mind. Only suitably qualified personnel should make the connections to services and the electrical supply, fitted by the customer, must comply to BS7671. The following lists cover the electrical and compressed air supplies required for your new machine. ELECTRICAL REQUIREMENTS DUST COLLECTORS & CYCLONES Fuses should be sized to comply with the full load current. When sizing fuses, smallest fuse rating should be used to suit motor and starting characteristics. SUPPLY TO C400 and C800 DUST COLLECTORSThese items require a supply of clean, dry and oil free compressed air to the regulator on the manifold, to operate the filter cartridge pulse cleaning. The supply should be at a pressure of between 40 and a maximum of 50 psi with a minimum flow rate of 2 cfm. A J4" BSP inlet fitting is supplied on the C400 and a !4" BSP inlet fitting on the C800. Modifications and improvements to Guyson machines are introduced from time to time as a direct result of our policy of continuous development. Consequently all designs and specifications quoted must be regarded as subject to change. Ref: Blast Services Guyson International Ltd. Tel: 01756 799911

 Open the catalog to page 1
Blast Machine Services-2

SERVICES REQUIRED - MANUAL BLAST CABINETS / GUYSON / COMPRESSED AIR REQUIREMENTS:Main Supply To Blast Cabinet The compressed air supply should in all cases be sufficient to allow the blast nozzle (or the dust collector if compressed air is additionally required) to operate efficiently at all times. Restrictions to either the flow or the pressure could affect the performance of the equipment. The supply should be clean, dry and oil free and through pipework with a large enough bore so as not to offer restrictions to the flow. We would recommend that a minimum bore of 1" (25 mm) be used. For Multiblast...