1. Catalogs
  2. Goulds Pumps
  3. Polyshield® Baseplate/Foundation System
video corpo

Polyshield® Baseplate/Foundation System
1 /4Pages

Polyshield® Baseplate/Foundation System

Polyshield® Baseplate/Foundation System
1 /4Pages

Catalog excerpts

Polyshield® Baseplate/Foundation System-1

GOULDS PUMPS Polyshield® Baseplate/Foundation System

 Open the catalog to page 1
Polyshield® Baseplate/Foundation System-2

Polyshield ® Baseplate/Foundation System • 316SS Fastener and Inserts are standard. • One-piece removable Polymer Motor Block. Provides full motor foot support to minimize soft foot conditions. Each block accommodates two NEMA motor sizes. • Self-venting design with Grout Hole and plug. • Integral Drip Basin. • Standard 316SS Inserts provide flatness of 0.005"/ft. (Optional A-20 and Hastelloy C available.) Optional Machine Mounting Pads (shown here) provide flatness of 0.002"/ft. • 316SS Jack Bolts for fast & accurate motor alignment. • CPVC Drain connection standard. • Available in heights from...

 Open the catalog to page 2
Polyshield® Baseplate/Foundation System-3

Now compare the advantages! Significantly Less Installation Costs Because of the reduced number of steps, Polyshield® can lower the number of hours needed to complete the installation up to 64% over conventional Cast Iron or Fab Steel bases. $7,492 $5,670 $5,103 Cost in Dollars $ 8000 7000 6000 5000 4000 3000 2000 1000 0 PIP Steel Base PreGrouted Cast Iron $5,078 Polyshield ® Chemical Resistance Method Comparison Typical Procedure Concrete Polyshield Foundation Foundation Install rebar Construct a form Mix concrete Pour concrete Wait for initial cure Break out form Cure for 7-28 days Prepare...

 Open the catalog to page 3
Polyshield® Baseplate/Foundation System-4

Installation Steps for Polyshield ® Installation & Maintenance Savings • Baseplate & Foundation Polyshield® Baseplates are less expensive than most metal bases and epoxy grout foundations. • Grout Polyshield® Baseplates are filled with regular 3000psi concrete fill which is less expensive than epoxy grouts. Install Polyshield ® Foundation complete with pump and motor over rebar. • Preparation Metal baseplates must be sandblasted for grout adhesion. Polyshield does not. Note: No need to remove pump and motor. • Installation No concrete forms, no grout air pockets and no long cure times as with...

 Open the catalog to page 4

All Goulds Pumps catalogs and technical brochures

  1. 3420 series

    11  Pages

  2. 3316 series

    12  Pages

  3. JC series

    12  Pages

  4. 3175 series

    16  Pages

  5. AF series

    8  Pages

  6. 3180

    20  Pages

  7. 3700

    12  Pages

  8. Goulds 7200SB

    12  Pages

  9. Goulds 3400

    11  Pages

  10. Goulds AF

    8  Pages

  11. IC i-FRAME

    24  Pages

  12. Goulds ICP

    8  Pages

  13. Goulds 3175

    16  Pages

  14. Goulds 3355

    7  Pages

  15. Goulds 3335

    4  Pages

  16. Goulds 3316

    12  Pages

  17. Goulds 3298

    20  Pages

  18. Goulds 3180

    20  Pages

  19. Goulds JCU

    8  Pages

  20. Goulds 3640

    8  Pages

  21. ICM

    8  Pages

  22. LF 3196 i-FRAME

    11  Pages

  23. CV 3196 i-FRAME

    11  Pages

  24. Goulds 3796

    11  Pages

  25. 3196 i-FRAME

    19  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.