1. Catalogs
  2. GHT Solutions Ltd
  3. AirHC1000 - warm water post heater/ cooler

AirHC1000 - warm water post heater/ cooler

AirHC1000 - warm water post heater/ cooler

AirHC1000 - warm water post heater/ cooler

Product catalog summary
Introduction
This document is the installation manual for the AirHC1000, a warm water post heater/cooler designed for air handling systems. It is crucial to read the manual thoroughly before installation, which must be performed by authorized personnel only. The manual should be retained for future reference.

Product Description
The AirHC1000 is a compact, highly efficient duct air post-heater/cooler with EPP insulation, suitable for airflows up to 1000 m³/h (588 CFM). It is compatible with both ventilation recovery units and standalone systems, operating effectively in extreme weather conditions.

Warranty and Liability
The product comes with a 2-year warranty covering material and construction defects. The warranty is void if unauthorized modifications are made, non-genuine parts are used, or if the unit is improperly installed or maintained.

Safety Instructions
Installation must comply with local building and safety regulations. Only authorized plumbers should handle installation and maintenance. Safety precautions include disconnecting the power supply before maintenance and ensuring the hydraulic circuit pressure is released.

Installation Prerequisites
Ensure sufficient space for air duct connections and maintenance. The unit should be mounted on a wall capable of supporting its weight, with a minimum clearance of 1 meter for maintenance.

Installation Process
1. Mount the unit using a wall bracket.
2. Connect air ducts and ensure airtight seals.
3. Drain condensate using a siphon, ensuring frost protection.
4. Connect media supply using PE-pipes and insulate all brine pipes.

Maintenance
Regular maintenance includes checking the heat exchanger every 3 months, replacing filters, and ensuring the system is free from sediments and damages. Only use genuine filters and avoid aggressive cleaners.

Contact Information
For further assistance, contact "GHT SOLUTIONS" Ltd, located at 18; Block 19 Vincenti Bld, Strait Street, VLT 1432, Valletta, MALTA. Visit their website at www.ghtsolution.com.
See more

Catalog excerpts

AirHC1000 - warm water post heater/ cooler-1

SUSTAINABLE SOLUTIONS FOR YOUR COMFORT • Please read this instruction manual completely before installing the product. INTERNATIONAL 2025 • Installation work must be performed by authorized personnel only. Valid from 1st of September 2025 . Please retain this installation manual for future reference after reading it thoroughly.

 Open the catalog to page 1
AirHC1000 - warm water post heater/ cooler-2

Thank you for purchasing AirHC1000 - warm water post heater/cooler. READ THESE INSTRUCTIONS CAREFULLY BEFORE INSTALLING AND USING THE EQUIPMENT! THIS INSTRUCTION HAS BEEN MADE WITH THE GREATEST CARE. HOWEVER, THIS INSTRUCTION CONFERS NO RIGHTS. WE RESERVE THE RIGHT TO CHANGE ALL OR PART OF THE CONTENTS OF THIS INSTRUCTION WITHOUT PRIOR NOTICE. This instruction contains all information necessary for an optimal installation and startup by skilled personnel. It can also be used as a manual for maintenance and service work. It is absolutely important to follow the instructions in this manual very...

 Open the catalog to page 2
AirHC1000 - warm water post heater/ cooler-3

The AirHC 1000 has been developed and produced for use in so called comfort ventilation systems also for Controlled environment agriculture (CEA). Any other use is considered an improper use and can lead to damages to equipment and persons; the manufacturer is not liable in such cases. The manufacturer is not liable for any damages caused by: • non-compliance of safety, operation and maintenance notes; • improper installation; • defects that occur due to improper connection or use and decontamination of the system; • after the warranty period has elapsed; • normal wear and tear. Please obey the...

 Open the catalog to page 3
AirHC1000 - warm water post heater/ cooler-4

The liquid inside the system must not freeze. Freezing of the liquid would damage the system irreparably. The condensate has to be drained off unit. Use a siphon to drain off the condensate. We recommend not to install the unit in rooms with high humidity (e.g. bathroom/toilet). Thereby, condensate formation on the outside of the unit is prevented. An intake air isolation damper is required if the system is used in areas with temperatures below -15 °C. This isolation damper has to block the air in case of a power outage. A power outage can damage the system if the temperature is below -15 °C....

 Open the catalog to page 4
AirHC1000 - warm water post heater/ cooler-5

Siphon connection Check the water drain with connected intake air duct and MVHR unit switched on. 5.3.1 Connection of the of the media supply; Connect one side of the PE-pipe with the help of an adapter to the inlet of the unit media (water/glycol) (A) Connect one side of the PE-pipe with the help of an adapter to the outlet of the unit media (water/glycol) connection (B). Both connections are ¾ inch tapered external thread. A Insulate all brine pipes of the brine circuit. All brine pipes inside the building and the wall bushing have to be sealed steam-tight and heat-insulated to avoid condensate....

 Open the catalog to page 5
AirHC1000 - warm water post heater/ cooler-6

Replace filter -“A” if airflow direction is from left to right -"B" if airflow direction is from right to left 6. Close front door Only use genuine filters provided by the manufacturer. Check the brine/water-to-air heat exchanger at least every 3 months. 1. Stop ventilation system. 2. Open front door 4. Check the lamellas of the brine-to-air heat exchanger for sediments and damages. • Use a lamella comb to align the lamellas. • Rinse the battery with tepid tap water. A essive or solvent cleaners! 5. When all work is done insert filter 6. Close front door. Installation manual

 Open the catalog to page 6
AirHC1000 - warm water post heater/ cooler-7

Vincent Buildings, Office 18, Block 19, Straitstreet, Valletta, VLT 1432, Malta We, GHT Solutions Ltd., declare that the product: For the evaluation of the compliance with this Directives, the following standards or standardized documents were applied: TUV Report reference number: 140483404E/45018/TR/14 We hereby certify that the mentioned products comply with applicable requirements in following EU directives / UK-Regulations: • Pressure Equipment (Safety)Regulations 2016 The following coils using air as secondary fluid complies with the Directive / Regulations conditions: • Air heating / cooling...

 Open the catalog to page 7
AirHC1000 - warm water post heater/ cooler-8

Contacts "GHT SOLUTIONS" Ltd 18; Block 19 Vincenti Bld, Strait Street, VLT 1432, Valletta, MALTA www.ghtsolution.com

 Open the catalog to page 8
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.
About DirectIndustry
DirectIndustry is a marketplace that offers B2B players a complete experience, from product sourcing to purchase. DirectIndustry is an entity of VirtualExpo Group.