1. Catalogs
  2. GE Vernova
  3. LMS100 POWER PLANTS

LMS100 POWER PLANTS

LMS100 POWER PLANTS

Product catalog summary
Overview
The LMS100 aeroderivative gas turbine by General Electric is highlighted for its exceptional efficiency and rapid startup capabilities. It is recognized as the highest simple cycle efficiency gas turbine globally, with an intercooled system that allows for an 8-minute startup to full load and emergency ramp speeds of up to 500 MW/minute. This makes it particularly beneficial in areas with high renewable energy penetration, such as California.

Key Capabilities
  • Desalination: The waste heat from the intercooler can be used for desalination, generating over 3,000 gallons per minute.
  • Fuel Versatility: The turbine supports dual fuel capability, allowing fuel switching at full power.
  • Sustainability: It offers a zero water option and is the lowest CO2 emitting simple cycle gas turbine.

Performance Specifications
  • Simple Cycle Efficiency: Greater than 44% with a net output of 117 MW.
  • Combined Cycle (CC) Performance: The CC net output ranges from 140 MW to 284 MW, with efficiencies between 52.2% and 53.2%.
  • Ramp Rate: The plant can ramp up at 50 MW/min for single CC and 100 MW/min for double CC configurations.
  • Startup Time: Hot startup time is approximately 30 minutes.

Additional Notes
All performance ratings are based on ISO conditions and natural gas fuel, with actual performance subject to variation based on specific project conditions and fuel types.
See more

Catalog excerpts

LMS100 POWER PLANTS-1

lmsioo power plants117 mw >44%simple cycle output simple cycle efficiency capability Desalination capability from waste heat off intercooler can generate up to 3,000+ gallons per minute versatility Available dual fuel capability with fuel switching at full power sustainability Zero water option and lowest CO2 emitting simple cycle gas turbine If it’s efficiency you’re looking for, search no more. Our LMS100 aeroderivative gas turbine is the highest simple cycle efficiency gas turbine in the world. Its intercooled gas turbine system provides rapid startup, with an 8-minute start to full load and emergency ramp speeds of up to 500 MW/minute. In high renewable penetration areas like California, our LMS100 gas turbines are providing 2.8 GW of generation with more than 1,400 MW/minute of ramping capability. NOTE: All ratings are net plant, based on ISO conditions and natural gas fuel. Actual performance will vary with project-specific conditions and fuel. gepower.com © 2018 General Electric Company. All rights reserved. GEA32933A (11/2018)

 Open the catalog to page 1

All GE Vernova catalogs and technical brochures

  1. LM6000

    1  Page

  2. LMS100®

    7  Pages

  3. 1212_1012

    12  Pages

  4. HSR line

    6  Pages

  5. 7E.03 HDGT

    15  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.