1. Catalogs
  2. GE Vernova
  3. LM6000 POWER PLANTS

LM6000 POWER PLANTS

LM6000 POWER PLANTS

Product catalog summary
Overview: GE's LM6000 aeroderivative gas turbine is a leader in the +40 MW space, with over 37 million operating hours and more than 1,200 units shipped. It boasts greater than 99% start and operational reliability and 98% availability. The turbine's 5-minute fast start enhances dispatch capability, while its two-spool design reduces maintenance costs. Its universal and modular packaging allows for a smaller footprint and quicker installation.
Capabilities: The LM6000 can achieve various dispatch profiles with a 3-minute synchronization to the grid.
Versatility: It operates from peaking to baseload and is applicable in combined cycle, simple cycle, industrial cogeneration, and district heating.
Sustainability: The LM6000 reduces greenhouse gas emissions as part of the LM6000 battery Hybrid EGT offering.
Performance Metrics:
  • Simple Cycle Efficiency: Greater than 41%.
  • Simple Cycle Output: 45-58 MW.
  • LM6000 SAC and DLE Performance:
    • SC Net Output: 55/57 MW and 53/58 MW respectively.
    • SC Net Heat Rate: 8,692 Btu/kWh and 8,271 Btu/kWh respectively.
    • SC Net Efficiency: 39.3% and 41.3% respectively.
  • 1x CC Plant Performance:
    • CC Net Output: 73/76 MW and 70/77 MW respectively.
    • CC Net Heat Rate: 6,535 Btu/kWh and 6,105 Btu/kWh respectively.
    • CC Net Efficiency: 52.2% and 55.9% respectively.
    • Plant Turndown – Minimum Load: 19.0% and 37.0% respectively.
    • Ramp Rate: 50 MW/min.
    • Startup Time: 30 minutes.
  • 2x CC Plant Performance:
    • CC Net Output: 146/153 MW and 142/155 MW respectively.
    • CC Net Heat Rate: 6,516 Btu/kWh and 6,085 Btu/kWh respectively.
    • CC Net Efficiency: 52.4% and 56.1% respectively.
    • Plant Turndown – Minimum Load: 19.0% and 18.0% respectively.
    • Ramp Rate: 100 MW/min.
    • Startup Time: 30 minutes.
Note: All ratings are net plant, based on ISO conditions and natural gas fuel. Actual performance will vary with project-specific conditions and fuel.
See more

Catalog excerpts

LM6000  POWER PLANTS-1

1.) MW output without SPRINT / with SPRINT. NOTE: All ratings are net plant, based on ISO conditions and natural gas fuel. Actual performance will vary with project-specific conditions and fuel. CAPABILITY Achieves various dispatch profiles with 3-minute synchronization to the grid VERSATILITY Operates from peaking to baseload with applications in combined cycle, simple cycle, industrial cogeneration, and district heating SUSTAINABILITY Reduces greenhouse gas emissions as part of the LM6000 battery Hybrid EGT* offering 37 million operating hours and more than 1,200 units shipped makes GE’s LM6000 aeroderivative gas turbine a leader in the +40 MW space. The LM6000 offers greater than 99 percent start and operational reliability and 98 percent availability. Its 5-minute fast start allows operators to differentiate their dispatch capability while a simple two-spool design results in lower overall maintenance costs. Universal and modular packaging gives the LM6000 a smaller footprint and allows for faster installation and commissioning. gepower.com © 2018 General Electric Company. All rights reserved. GEA32935A (11/2018)

 Open the catalog to page 1

All GE Vernova catalogs and technical brochures

  1. LM6000

    1  Page

  2. LMS100®

    7  Pages

  3. 1212_1012

    12  Pages

  4. HSR line

    6  Pages

  5. 7E.03 HDGT

    15  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.