HOT-DAY PERFORMANCE SWITCHING FROM A DIESEL ENGINE AND ELECTRIC GENERATOR (DIESEL GENSET) TO A TM2500 BURNING LIQUEFIED PETROLEUM GAS (LPG) CAN SAVE UP TO $7 MILLION PER YEAR IN OPERATING COSTS. T M 2 5 0 0 (5 0 H z) T M 2 5 0 0 (6 0 H z) H 2 CAPABILITY (TM2500 +G4 SAC†) †package changes are required The TM2500 is ideal for providing a baseload bridge to permanent power installations or SC Net Heat Rate (Btu/kWh, LHV) for generating backup power in the wake of SC Net Heat Rate (kJ/kWh, LHV) a natural disaster, plant shutdowns, or grid CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) containerized balance of plant, can put power on the grid within as little as 30 days of the Plant Turndown – Minimum Load (%) contract signature. This fast power provides Startup Time (RR Hot†, Minutes) CC Net Output (MW) 2X CC PLANT PERFORMANCE Ramp Rate (MW/min) CC Net Heat Rate (Btu/kWh, LHV) Plant Turndown – Minimum Load (%) Ramp Rate (MW/min) Startup Time (RR Hot†, Minutes) trailer-mounted gas turbine generator set and CC Net Heat Rate (kJ/kWh, LHV) instability. Our complete solutions, including a NOTE: ll ratings are net plant, based on ISO conditions and natural gas fuel. Actual performance will vary with project-specific A conditions and fuel. † Rapid Response/Hot Start the greatest power density among gas turbine trailer-mounted offerings.
Open the catalog to page 11 Page
1 Page
2 Pages
2 Pages
1 Page
27 Pages
20 Pages
7 Pages
2 Pages
1 Page
1 Page