GT13E2 heavy duty gas turbine
1Pages

{{requestButtons}}

Catalog excerpts

GT13E2 heavy duty gas turbine - 1

195-210 MW SIMPLE CYCLE OUTPUT >55% COMBINED CYCLE EFFICIENCY THE GT13E2 HAS TWO OPERATING MODES TO PRIORITIZE EITHER OUTPUT OR AVAILABILITY, AND CAN OPERATE IN EXTREME CONDITIONS FROM -50°C TO +55°C. With over 190 gas turbines installed and more than 14 million operating hours in a wide range SC Net Heat Rate (Btu/kWh, LHV) of environmental and operational conditions, SC Net Heat Rate (kJ/kWh, LHV) CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) the GT13E2 is available for operators needing power and performance or those looking to Plant Turndown – Minimum Load (%) fit a wide range of power plant applications. Available through two complementary models, maximize turbine availability while reducing their operating cost. The GT13E2 can reliably Startup Time (RR Hot†, Minutes) CC Net Output (MW) 2X CC PLANT PERFORMANCE Ramp Rate (MW/min) CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) hardware changes, and can also operate Plant Turndown – Minimum Load (%) Ramp Rate (MW/min) Startup Time (RR Hot†, Minutes) NOTE: ll ratings are net plant, based on ISO conditions and natural gas fuel. Actual performance will vary with project-specific A conditions and fuel. † Rapid Response/Hot Start operate with a wide range of fuel compositions, including high hydrocarbon fuels, without

Open the catalog to page 1

All GE Power catalogs and technical brochures

  1. TM2500

    1 Pages

  2. D200/A200

    2 Pages

  3. LM2500

    1 Pages

  4. GAS TO POWER

    20 Pages

  5. LMS100®

    7 Pages