1. Catalogs
  2. GE Power
  3. 7HA.01/.02/.03
video corpo

7HA.01/.02/.03
1 /1Page

7HA.01/.02/.03

7HA.01/.02/.03
1 /1Page

Catalog excerpts

7HA.01/.02/.03-1

290-430 MW SIMPLE CYCLE OUTPUT >64% COMBINED CYCLE EFFICIENCY A 7HA COMBINED CYCLE PL ANT, NOW CAPABLE OF >64% EFFICIENCY, PROVIDES A >50% REDUC TION IN CO 2 EMISSIONS VS . A SIMIL AR SIZE COAL FIRED ASSE T. HYD RO G E N (H 2 ) C APAB LE WITH A TECH N O LO GY PATHWAY E NAB LI N G A FUTU RE Today, more than 50 7HA gas turbines have been installed around the globe. These units SC Net Heat Rate (Btu/kWh, LHV) support base load, load following, peaking, and SC Net Heat Rate (kJ/kWh, LHV) cogeneration for district heating applications. CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) towards a world with less carbon emissions, providing the reliable and flexible power Plant Turndown – Minimum Load (%) generation needed to complement renewable Ramp Rate (MW/min) Startup Time (RR Hot†, Minutes) CC Net Output (MW) 2X CC PLANT PERFORMANCE energy sources. CC Net Heat Rate (kJ/kWh, LHV) the energy transition progresses and we move CC Net Heat Rate (Btu/kWh, LHV) The 7HA gas turbine will be a key enabler as Plant Turndown – Minimum Load (%) Ramp Rate (MW/min) Startup Time (RR Hot†, Minutes) NOTE: ll ratings are net plant, based on ISO conditions and natural gas fuel. Actual performance will vary with project-specific A conditions and fuel. † Rapid Response/Hot Start

 Open the catalog to page 1
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.