45 MW SIMPLE CYCLE OUTPUT >51% COMBINED CYCLE EFFICIENCY THE 6B OPER ATES ON A WIDE R ANGE OF GA SEOUS AND LIQUID FUEL S , INCLUDING UP TO 10 0 % HYDROGEN , ALLOWING FOR USE OF THE MOS T ECONOMIC AL AND C ARBON-SENSITIVE FUEL S AVAIL ABLE. Rugged, versatile, and reliable is the best way to describe plants utilizing GE’s 6B.03 gas turbine. SC Net Heat Rate (Btu/kWh, LHV) The turbine can ramp to 20 MW in less than five SC Net Heat Rate (kJ/kWh, LHV) minutes and accommodate nearly every non- power operations. Capable of black starts on CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) volatile grid environments, the 6B.03 remains a preferred solution for remote installation and Plant Turndown – Minimum Load (%) extreme operation conditions. Pre-installed gas Ramp Rate (MW/min) Startup Time (RR Hot†, Minutes) CC Net Output (MW) 2X CC PLANT PERFORMANCE standard fuel in cogeneration and industrial turbine packaging means easier transport and faster site installation—as quick as six months from order to operation. GE has built more than CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) 1,100 6B units, and the platform has exceeded 90 million running hours. Plant Turndown – Minimum Load (%) Ramp Rate (MW/min) Startup Time (RR Hot†, Minutes) NOTE: ll ratings are net plant, based on ISO conditions and natural gas fuel. Actual performance will vary with project-specific A conditions and fuel. † Rapid Response/Hot Start
Open the catalog to page 11 Page
1 Page
2 Pages
2 Pages
1 Page
27 Pages
20 Pages
7 Pages
2 Pages
1 Page
1 Page