Catalog excerpts
The World’s Largest and Most Efficient Heavy Duty Gas Turbine GE’s 7HA gas turbine is the industry leader among H-class offerings and is available in two models—the 7HA.01 at 275 MW and the 7HA.02 at 337 MW. Thanks to a simplified air cooled architecture, advanced materials, and proven operability and reliability, the 7HA delivers the lowest life cycle cost per MW for 60 Hz applications. The economies of scale created by this high power density gas turbine, combined with its more than 61% combined cycle efficiency, enable the most cost effective conversion of fuel to electricity to help operators meet increasingly dynamic power demands. Simple Cycle Output >61% COMBINED CYCLE EFFICIENCY Industry-Leading Operational Flexibility for Increased Dispatch and Ancillary Revenue • Fast 10-minute ramp-up from start command to gas turbine full load. • 0 MW/minute ramping capability within emissions compliance. 5 • eaches turndown as low as 25% of gas turbine baseload output R within emissions compliance. • uel flexible to accommodate gas and liquid fuels with wide gas F variability, including high ethane (shale) gas and liquefied natural gas. Least Complex H-Class Offering • simpler configuration than GE’s previous H-class fleet and one A that does not require a separate cooling air system. • he 7HA is now available with an air cooled generator for T simplified installation and maintainability. • Modular systems ease installation with 10,000 fewer man-hours than GE’s 7F.03 gas turbine. • treamlined maintenance with quick-removal turbine roof, fieldS replaceable blades, and 100% borescope inspection coverage for all blades. • Simplified dual fuel system uses less water, eliminates recirculation, and utilizes enhanced liquid purge for improved reliability and dependability. Full-Load Validation • t the heart of GE’s heavy duty gas turbine validation program is A the advanced full-scale, full-load test facility in Greenville, SC. • est stand enables GE to validate the 7HA gas turbine over an T operating envelope larger than the variances an entire fleet of turbines would experience in the field, an approach that is superior to operating a field prototype for 8,000 hours. Power Plant Configuration CC Net Output (MW) CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV) Bottoming Cycle Type Plant Turndown – Minimum Load (%) Ramp Rate (MW/min) Startup Time (Hot, Minutes) Power Plant Configuration CC Net Output (MW) CC Net Heat Rate (Btu/kWh, LHV) CC Net Heat Rate (kJ/kWh, LHV) CC Net Efficiency (%, LHV) Bottoming Cycle Type Plant Turndown – Minimum Load (%) Ramp Rate (MW/min) Startup Time (Hot, Minutes) Frequency SC Net Output (MW) SC Net Heat Rate (Btu/kWh, LHV) SC Net Heat Rate (kJ/kWh, LHV) SC Net Efficiency (%, LHV) Exhaust Energy (MM Btu/hr) Exhaust Energy (MM kJ/hr) GT Turndown Minimum Load (%) GT Ramp Rate (MW/min) NOx (ppmvd) at Baseload (@15% O2) CO (ppm) at Min. Turndown w/o Abatement Wobbe Variation (%)
Open the catalog to page 1Efficient, Flexible, Reliable Power GE offers the world's largest range of heavy Product Platform Evolution H-Class Gas Turbine Orders First 9H GasTurbine Enters Commercial Operation Full Speed, No Load Testing of the 7H GasTurbine Full Speed, No Load Testing of the 9H GasTurbine H System* Tech no logy Introduced F-Class Technology First First 7H GasTurbine Enters Commercial Operation GE Launches the FlexEfficiency 50* Combined Cycle Power Plant for 50 Hz Regions that Can Provide More than 61%Combined Cycle Efficiency GE Launches the FlexEfficiency 60* Combined Cycle Power Plant for 60 Hz...
Open the catalog to page 2All GE Gas Turbines catalogs and technical brochures
-
LM6000
1 Pages
-
STEAM POWER SERVICES CATALOG
94 Pages
-
NUCLEAR POWER PRODUCT CATALOG
28 Pages
-
STEAM POWER PRODUCT CATALOG
61 Pages
-
2018 POWER SERVICES CATALOG
111 Pages
-
7E POWER PLANTS
1 Pages
-
LMS100®
7 Pages
-
LMS100 POWER PLANTS
1 Pages
-
LM2500 POWER PLANTS
1 Pages
-
LM6000 POWER PLANTS
1 Pages
-
6B POWER PLANTS
2 Pages
-
9E & GT13E2 POWER PLANTS
2 Pages
-
6F POWER PLANTS
2 Pages
-
7F POWER PLANTS
2 Pages
-
9F.04, 9F.05, 9F.06
2 Pages
-
Reciprocating Engines
2 Pages
-
69663_aftermkt_bro
4 Pages
-
1483_1112.indd
1 Pages
-
18900_5_15
8 Pages
-
66535_reman_bro_redo_FINAL
6 Pages
-
1212_1012
12 Pages
-
Powering the world 2016
72 Pages
-
raising the bar
8 Pages
-
Waukesha* gas engines
12 Pages
-
6 F. 01 Gas Turbine
4 Pages
-
9HA.01 / .02 GAS TURBINE
2 Pages
-
Dresser? Turbine Meters
8 Pages
-
HSR line
6 Pages
-
CNG In A Box? system
16 Pages
-
Becker? T-Ball? Anti-Surge Valve
12 Pages
-
Becker V0 Control Valves
12 Pages
-
Ajax? E-565 Gas Engine
2 Pages
-
7E.03 HDGT
15 Pages
-
Baghouse Accessories
12 Pages
-
Fabric Filter Bags & Cages
2 Pages
-
GE10 15 ppm combustor
3 Pages
-
GE10-1 Gas Turbine
8 Pages
-
GE10-2 15 ppm combustor
3 Pages
-
Frame 6 Gas Turbine
3 Pages
-
GE10 Gas Turbine
6 Pages
-
Heavy Duty Gas Turbine Products
24 Pages
-
Product Structuring
5 Pages
-
Gas Turbines Catalog
31 Pages
Archived catalogs
-
7HA gas turbine
4 Pages
-
9HA Gas turbine
4 Pages