Unloading of the Gearbox
Proper load distribution is crucial during the unloading process. Ensure lifting ropes are correctly positioned and the gearbox's output shaft remains level while suspended by the crane.
Cleaning of Surfaces
Before installation, clean the gear output shaft, roller press shaft, and shrink disc thoroughly. Surfaces must be free from oil, dust, and contaminants to ensure proper installation and function of the shrink disc.
Assembly of the Shrink Disc
The shrink disc should be mounted and positioned on the gear output shaft before installation with the roller press.
Installation and Alignment of the Gearbox
Use a suitable crane and lifting ropes to install the PPU onto the roller press drive shaft. Check the shaft for sharp edges and high points to ensure smooth installation.
Retightening of the Shrink Disc
After installing the gearbox onto the roller press, tighten all bolts of the shrink disc to the specified torque.
Installation of the Torque Arms
Clean all contact surfaces thoroughly before installing the torque arm. Ensure proper tightening of the torque arm bolts.
Installation of Motor
Mount the coupling hub to the motor shaft and place the motor on the foundation in its initial position.
Positioning and Installation of the Lubrication System
Position the lubrication system according to the GA drawing. Clean and pickle all on-site manufactured pipes as per the instruction manual.
Installation Completed
See more

Catalog excerpts

Installation of PPU at Orient Cement-1

Installation of PPU at Orient Cement Unloading of the gearbox In order to ensure proper load distribution the lifting ropes must be carefully positioned. Furthermore the output shaft of the gearbox must be in level while hanging on the crane. Cleaning of surfaces Prior to the installation of the gearbox, the gear output shaft, roller press shaft and the shrink disc must be thoroughly cleaned. To ensure prober installation and reliable function of the shrink disc, the surfaces must be absolutely free from oil, dust and other contaminations. Assembly of the shrink disc on the output shaft The shrink disc was mounted and positioned on the gear output shaft prior to the installation with the roller press. Installation and alignment of the gearbox The PPU was installed onto the roller press drive shaft by using a suitable crane and lifting ropes. In order to ensure smooth installation, it's essential to check the shaft for sharp edges and high points prior to its installation. Retightening of the shrink disc After successful installation of the gearbox onto the roller press, all the bolts of the shrink disc must be tighten with its specified torque.

 Open the catalog to page 1
Installation of PPU at Orient Cement-2

Installation of the torque arms All contact surfaces must be thoroughly cleaned prior to the installation of the torque arm. View on the installed torque arms and tightening of the torque arm bolts. Installation of motor Left: Mounting of the coupling hub to the motor shaft. Right: Motor placed on foundation in initial position. Positioning and installation of the piping for the lubrication system The lubrication system was positioned according to the GA drawing. All on site manufactured pipes have been cleaned and pickled as described in the instruction manual. Installation completed FLSmidth...