
The El Abra project, located at the El Abra Mine in Chile, was executed for the client Bechtel Corporation. The project involved the installation of mobile conveyor equipment to support mining operations.
The equipment was commissioned and started operation in 1996, providing high-capacity material handling solutions for the mine.
For further information, the equipment supplier can be contacted at their Spokane, WA office:
Address: 605 E. Holland Ave. Suite 300, Spokane, WA
Phone: 509.467.0770
Fax: 509.466.0212
Email: [email protected]
Website: www.flsmidth.com
El Abra Client ¡¡ Bechtel Corporation Location / Project ¡¡ El Abra Mine, Chile Equipment ¡¡ 1 Mobile Stacking Conveyor 1,378 ft / 420 m 1 Mobile Reclaiming Conveyor 1,378 ft / 420 m Start up ¡¡ 1996 Capacity ¡¡ 8,600 tph Stacking 9,500 tph Reclaiming 605 E. Holland Ave. Suite 300, Spokane, WA ¡ tel: 509.467.0770 fax: 509.466.0212 ¡ www.flsmidth.com [email protected]
Open the catalog to page 14 Pages
19 Pages
7 Pages
8 Pages
8 Pages
4 Pages
8 Pages
8 Pages
8 Pages
12 Pages
32 Pages
16 Pages
24 Pages
8 Pages
7 Pages
24 Pages
16 Pages
8 Pages
4 Pages
4 Pages
8 Pages
20 Pages
8 Pages
4 Pages
9 Pages
13 Pages
2 Pages
5 Pages
3 Pages
11 Pages
15 Pages
5 Pages
7 Pages
5 Pages
4 Pages
8 Pages
7 Pages
1 Page
1 Page
1 Page
1 Page
1 Page
1 Page
8 Pages
9 Pages
3 Pages
34 Pages
8 Pages
4 Pages
8 Pages
12 Pages
8 Pages