Catalog excerpts
FABU Address: Fabu Muhendislik A.§. Ye§iloba Mah. Turhan Cemal Beriker Blv. No: 632/A Seyhan-Adana/Turkey Tel: 0090.3224282733, Fax: 0090.322.4281772, E-mail: info@fabuas.com.tr Web: www.fabuas.com.tr, www.horizontaldrillinghammer.com TECHNICAL SPECIFICATIONS:
Open the catalog to page 1Operating Instructions: 1. The Machine works with the compressed air coming through the air compressor. 2. Use air compressor that can provide compressed air 4-5 m3/min. The hammer air consumption is 2,8 m3/min. 3. Air pressure should not exceed 6-7 bar. If it exceeds , the hammer can be damaged. 4. Use 1 inch air hose for the air inlet of the hammer. 5. Clean air hose which attaches the compressor and the Pile Driving hammer by blowing air through. Then mount it to the oiler. Repeat cleaning process every time when the hose is detached. 6. Do not attach deformed piles to the hammer. 7....
Open the catalog to page 2Oiler: The level of oil in the oiler is checked before using the machine , If it is low, then oil is added to the oiler. Use one of the following oils if ait temperature is equal or above 10 C. degree. Mobil Almo Oil No:3 Shell Tonna R Oil .41 BP Energol ME200cc. ESSO Millcot K-55 Use ESSO Milcot K-50 if the temperature is betwen 2-9 C degree. Use DEMAG Kilforst if the emperature is below 2 C degree. This valve controls the air that goes to the hammer. This arm is used for driving piles on the inclined roads This arm is used in making the boom vertical to the ground, to be able to drive the...
Open the catalog to page 3This arm is used for keeping the boom vertical The Wheel Position: To move the machine on the direction of the driving, the pin is removed, then the wheel is turned 90 degree as seen in the picture.
Open the catalog to page 4Trail Slide: When the trail table is to be lengthened, the pins on both sides are removed as seen in the picture, the slide is moved forward and then fixed with the pins again. IMPORTANT REMARK: User faults are not considered within warranty.
Open the catalog to page 5All FABU Engineering Incorporation catalogs and technical brochures
-
Pneumatic Tube Vibrator
1 Pages
-
Perforatrice Driller
1 Pages
-
Pneumatic Compacter
1 Pages
-
Pneumatic Rock Drill
1 Pages
-
F. HKT 20-S
1 Pages
-
F. HKT 30-S
1 Pages
-
Pile Driving Hammer
2 Pages
-
F.HKSC
2 Pages
-
Guardrail Post Driver
1 Pages
-
Hammer Drill
1 Pages
-
Pneumatic Surface Vibrator
1 Pages
-
Pile Driving Machine
1 Pages
-
Pneumatic Chipping Hammer
1 Pages
-
FABU Down Hole Hammer
1 Pages
-
FABU Coal Drill
1 Pages
-
FABU Compacter
1 Pages
-
FABU Rock Drill
1 Pages
-
FABU Pneumatic Breaker
1 Pages
-
FABU Tube Vibrator
1 Pages
Archived catalogs
-
FABU Chipping Hammer
1 Pages
-
FABU Surface Vibrator
1 Pages
-
FABU Pile Driver
1 Pages
-
FABU Horizontal Drill Rig
1 Pages