video corpo

TELETOWER

TELETOWER
1 / 36 PagesView full catalog

TELETOWER

Product catalog summary
Introduction
The TELETOWER® is a versatile tower or podium designed for DIY, trade, and professional use. It is made from anodised aluminum or fiberglass and is built to endure tough conditions. The manual provides essential instructions for optimal performance and safety.
Safety
Safety is crucial, and users must read the safety instructions before assembly or use. The TELETOWER® complies with the Work at Height Regulations of 2005. Key safety considerations include a maximum load of 150 kg, removing the platform when adjusting height or collapsing the unit, and wearing a hard hat during assembly.
Main Features
The TELETOWER® offers seven working heights from 0.33m to 2m, can be erected in under three minutes by one person, and is easily transportable. It consists of three main parts: the main assembly, platform, and toe boards, and conforms to EN1004 standards.
In the Box
The package includes the main assembly, lockable castors with stabilisers, an instruction manual, and optional toe boards for certain models.
Getting Started
The manual details the use of lock indicator buttons and the fitting of castors and stabilisers. It explains the deployment of ground stabiliser legs and the importance of ensuring all components are secure before use.
Assembly Procedures
  • Erecting the Safety Cage: Involves unlocking castors, releasing fabric straps, and lifting rungs to lock the safety cage in place.
  • Fitting the Platform: The platform must be mounted on RUNG 3, with specific instructions for handling and securing it.
Specifications
The manual provides detailed specifications for each model, including materials and dimensions.
Warranty
Information on warranty coverage and the availability of spare parts is provided, with a recommendation to visit the website for more details.
Platform Assembly and Safety Instructions
1. Platform Setup
The platform should be placed on RUNG 3, ensuring the location brackets sit over the rung and inside the guides. Safety catches secure the platform to RUNG 3. The platform level is set at 1 meter.
2. Fitting the Toe Board
The toe board consists of six sections with fixing brackets and screws. Front and rear boards have locating pins, while side boards have lugs that fit into slots. The assembly involves aligning and securing these components.
3. Deploying Platform Stabilisers
Stabilisers must be deployed when the platform height is 1.50 meters or more. They are adjustable to three lengths, with a color-coded system for correct extension. The stabilisers lock onto brackets two rungs below the platform.
4. Setting Platform Height
Platform height can be adjusted from 1.00 to 2.00 meters. The platform should be fitted at the required height, and removed before lowering the structure. Specific procedures are outlined for each height increment.
5. Collapsing the TELETOWER®
Before collapsing, remove the platform and toe board, and stow the stabilisers. The structure is collapsed by releasing locking mechanisms starting from RUNG 7 downwards. Safety warnings emphasize not releasing both buttons on a rung simultaneously and avoiding placing hands on moving rungs.
Assembly and Disassembly Procedures
  • Collapsing the Safety Cage: Follow a step-by-step process to collapse the safety cage by sequentially releasing buttons on each rung, starting from RUNG 7 down to RUNG 1.
  • Setting Up the Podium: Begin with the TELETOWER® fully collapsed. Unlock castors, unfasten straps, unfold the frame, and lock the gate. Adjust the frame and platform according to the desired height (33 cm or 61 cm).
Podium Setup Options
  • Option 1 and 2: Involves lifting RUNG 1 to lock the hand guardrail and adjusting handrails and knee rails for safety.
  • Ground Stabilisers: Unlock castors, position stabiliser legs, and ensure the podium is horizontal and secure before use.
Specifications
  • Maximum Load: 150 kg
  • Weights: Main Assembly - 41 kg, Platform - 14 kg, Total - 55 kg
  • Platform Heights: Options range from 33 cm to 2.00 m
  • Dimensions: Vary based on platform height, with specific measurements provided for each height.
  • Construction: Aluminum or Fibreglass, depending on the model
  • Standard: Conforms to EN1004
Warranty and Modifications
  • Warranty: 12-month coverage for defects due to faulty workmanship or materials, excluding misuse or unauthorized modifications.
  • Modifications: Require written approval from the Manufacturer for any alterations involving welding, drilling, or cutting.
Replacement Parts
  • Information available on the website for downloading illustrations and part listings.
Component Identification
  • Detailed list of components with corresponding numbers for easy identification.
See more

Catalog excerpts

TELETOWER-1

TELETOWER® Instruction and Reference Manual for models TTA02, TTA02TB, TTG02, TTG02TB For use as a TOWER or a PODIUM Seven working heights

 Open the catalog to page 1
TELETOWER-2

INTRODUCTION Thank you for purchasing the TELETOWER®. The TELETOWER® is manufactured in aluminum with an anodised finish. It is built to withstand the toughest handling and working conditions. It is suitable for DIY, trade and professional applications. Spare parts are readily available. You may already be familiar with using similar equipment but the TELETOWER® is unique and we recommend you to take time and read these instructions. They are designed to familiarize you with the features of the system and to ensure you get the very best performance from your purchase. Keep these instructions...

 Open the catalog to page 2
TELETOWER-3

CONTENTS INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 IMPORTANT SAFETY INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Safety Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 Servicing and Spare Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 MAIN FEATURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 IN...

 Open the catalog to page 3
TELETOWER-4

▲ WARNING For your safety, please read all the safety instructions in this Manual before using the TELETOWER®. Safety and quality is of paramount importance when manufacturing TELETOWER® products. All products meet the requirements of the Work at Height Regulations of 2005. IMPORTANT. Read these instructions before assembling the TELETOWER®. IMPORTANT. Always assemble the TELETOWER® according the instructions given in this Manual and on the labels affixed to the TELETOWER®. SAFETY CONSIDERATIONS General • Do not use the TELETOWER® if it is damaged in any way • Never exceed the maximum load of...

 Open the catalog to page 4
TELETOWER-5

The main features of the TELETOWER® are listed below. • Manufactured in anodised Aluminum (models TTA02 and TTA02TB) • Manufactured in Fibreglass (models TTG02 and TTG02TB) • Can be used as a Tower or a Podium • Has seven working height from 0.33m to 2m • Five-position stabiliser legs with locking castors • Can be erected in less than three minutes by a single person thereby saving down time and man hours • Folds down for ease of transportation and storage • Easily transportable in a small van or estate car thereby reducing fuel costs • Comprises only three parts (main assembly, platform and...

 Open the catalog to page 5
TELETOWER-6

IN THE BOX Carefully remove your TELETOWER® from the box it arrived in. It is recommended that you retain this packaging should the item need to be returned under warranty. EQUIPMENT AND ACCESSORIES SUPPLIED There are four models of the TELETOWER®: TTA02, TTA02TB, TTG02 and TTG02TB . The illustrations below apply to model TTA02TB where 'TB' indicates toe boards are supplied. (1) The main assembly in collapsed form (with folded platform) Four lockable castors with adjustable stabilisers The Instruction and Reference Manual (This publication) Toe boards in carrying case (optional with TTA02 and...

 Open the catalog to page 6
TELETOWER-7

LOCK INDICATOR BUTTONS The red and yellow buttons are used to show that the lock mechanisms are engaged or not when erecting the TELETOWER®. At all height settings, the yellow buttons should always be in the locked position i.e. guard rails should be in place, see page 9. At the 2 metre height setting, all yellow and red buttons should be in their locked position. The locking mechanism of a rung is situated at each end of the rung immediately below it. As a rung is lifted, it automatically locks to the frame when it is in the correct position. When this happens an audible 'click' will be heard....

 Open the catalog to page 7
TELETOWER-8

Fitting the castors To fit the castors carry out the following. 1. Carefully lay the fully collapsed main assembly (without platform) in a horizontal position on the floor or on a bench. Take a castor/stabiliser leg and slide the castor shaft into position on the main assembly. Push the red button on RUNG 9 away from the castor and push the castor shaft fully in and rotate until the castor is adjacent to rung 9. Release the button and if necessary rotate it a little further until you hear the lock-pin click into place, which locks the stabiliser in this position. PART OF FRAME CASTOR RELEASE...

 Open the catalog to page 8
TELETOWER-9

1. ERECTING THE SAFETY CAGE This procedure starts from when the TELETOWER® is in its fully collapsed arrangement, with castors fitted as in Figure 1.1. 1.1 Not locked ADJUSTABLE HAND-RAIL RUNG 1 RUNG 2 RUNG 3 RUNG 4 RUNG 5 RUNG 6 RUNG 7 ADJUSTABLE KNEE-RAIL LOCKING GATE RUNG 9 Ensure the castors are unlocked and the wheels are free to rotate. Release the two fabric straps fastened around the legs of the assembly that hold the two frames together. While keeping the frames together at the back, push the front legs slightly apart as shown in Figure 1.2. Lift and withdraw the folded platform and...

 Open the catalog to page 9
TELETOWER-10

LIFTING Hold both ends of RUNG 1 (Figure 1.3) and place one foot on RUNG 9. Lift RUNG 1 until it locks in place. A click will be heard when it locks and the yellow buttons on RUNG 2 should then be in the locked position. This has lifted the hand guardrail, see Figure 1.3. Locked Locked Click Click Locked Locked Locked Locked Click Click RUNG 2 2 RUNG RUNG 3 3 RUNG RUNG 4 4 RUNG RUNG 5 5 RUNG RUNG 6 6 RUNG RUNG 7 7 RUNG Locked Locked Click Click Click Click Click Click RUNG 3 3 RUNG RUNG 4 4 RUNG RUNG 5 5 RUNG RUNG 6 6 RUNG RUNG 7 7 RUNG LOCKING LOCKING GATE GATE LOCKING LOCKING GATE GATE Now...

 Open the catalog to page 10
TELETOWER-11

FRONT AND REAR RAILS 1. Hold the yellow cover on the end of an upper handrail using your thumb and fingers, and push it towards the end of the rail. Hold it in this position while you lift the end to unfasten it from its anchor point, see Figure 1.5. Rotate the anchor point through 90 degrees to face the opposite side frames, see Figure 1.6. Rotate the rail end towards the opposite frame. Extend the rail until you hear two clicks. This tells you that the 3-part rail has been securely locked in its extended position. Carefully let the rail hang down from the attached end. Note. You should be able...

 Open the catalog to page 11

All Euro Towers Ltd catalogs and technical brochures

  1. 232 tower

    1  Page

  2. AGR

    1  Page

  3. euro 500

    6  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.